Solar · United Kingdom
Creyke Beck Substation - Solar Farm & Battery Storage
Operator Albanwise Synergy Limited · Owner Albanwise Holdings Limited
Awaiting Construction49.9 MWData checked 16 November 2026Source record dated 15 February 2024
Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.
Creyke Beck Substation - Solar Farm & Battery Storage is a 49.9 MW solar farm 6.8 km north-west of Kingston upon Hull, East Riding of Yorkshire, United Kingdom. Its planning application (21/02335/STPLF) went to East Riding of Yorkshire on 5 August 2021 and was granted on 6 January 2022. Its status in the Renewable Energy Planning Database (UK government) is awaiting construction. There are 63 other energy sites within 10 km, 42 of them solar farms (hybrid battery and solar sites included). The register holds no incident at this site. It holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom, and 480 worldwide.
Get an email when Creyke Beck Substation - Solar Farm & Battery Storage changes
Free. An email when its status changes: a planning decision, building starting, going live or closing. And each Monday, solar PV incidents in the United Kingdom. No account needed; unsubscribe in one click.
Confirm your email and every solar incident on the register arrives at once as a spreadsheet (CSV), free.
Get a free sample brief Three complete verified records and the incidents-per-GW table, by email within a minute.
We will also email you about the register's paid records and plans, at most once a week and three times in all. You can stop these at any time. By signing up you agree to the privacy policy.
The company behind this site
ALBANWISE SYNERGY LIMITED (12275361), active, since 2019. 2 outstanding charges on the register. Members see the charges register: each charge, when it was created and the lender it is in favour of.
Source: Companies House, matched by the operator's name. If this is the wrong company, tell the editor.
Preparing, reviewing or responding to a planning application for a site like this? The planning evidence pack for Creyke Beck Substation - Solar Farm & Battery Storage sets out every comparable incident for this project, with sources. £295, by email in minutes; the order form arrives filled in from this record.
Get the evidence pack for this site, £295 See a sample pack (PDF)
Preview of the planning evidence pack for this site
The pack for this site lists 5 comparable battery incidents in the United Kingdom, grid-scale only, nearest first. The nearest is EIR-0584, Fire in a battery container at Rufford Colliery BESS, Rainworth; owner attributes it to a short circuit in NMC cells, 87 km from this site.
| Reference | Year | Incident | From the site | Severity |
|---|---|---|---|---|
| EIR-0584 | 2026 | Fire in a battery container at Rufford Colliery BESS, Rainworth; owner attributes it to a short circuit in NMC cells | 87 km | Significant |
| EIR-0638 | 2020 | Explosion and prolonged fire at Orsted battery storage site in Liverpool | 170 km | Major |
| EIR-0058 | 2025 | Fire in two battery containers at Cirencester Hybrid Solar Farm, Gloucestershire | 251 km | Significant |
| •••••••• | •••• | •••••••••••••••••••••••••••••• | •••• | •••••• |
| •••••••• | •••• | •••••••••••••••••••••••••••••• | •••• | •••••• |
The first 3 rows as the pack shows them. The other 2 are in the pack, each with its distance, sources and the fire service guidance it bears on.
The map
Summary for this site
This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.
Paragraphs for the planning statement
This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.
In the full packThe site
- Technology
- Solar
- Capacity
- 49.9 MW
- Capacity figure from
- Renewable Energy Planning Database (UK government)
- Status
- Awaiting Construction (Planning Permission Granted)
- Operator or applicant
- Albanwise Synergy Limited
- Owner
- Albanwise Holdings Limited
- Location
- S/O Creyke Beck Substation, 4875 Park Lane, Cottingham, East Riding of Yorkshire, HU16 4AZ, United Kingdom
- Planning authority
- East Riding of Yorkshire
- Planning application
- 21/02335/STPLF
View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.
The planning application page for 21/02335/STPLF, with what the planning evidence pack adds for this site.
Every application in East Riding of Yorkshire · Alerts for applications and incidents near here
Timeline
- 5 August 2021 Planning application submitted
- 6 January 2022 Planning permission granted
- 6 January 2025 Planning permission expired
Incidents on the register at this site
None found. The register holds no published incident that names Creyke Beck Substation - Solar Farm & Battery Storage. If you know of one, report it (confidential reports are anonymised).
Questions
- Has Creyke Beck Substation - Solar Farm & Battery Storage had a fire or other incident?
- None is on the register as of 21 November 2026. The register holds no published incident that names Creyke Beck Substation - Solar Farm & Battery Storage; it holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom.
- What is the status of Creyke Beck Substation - Solar Farm & Battery Storage?
- Awaiting Construction, in the Renewable Energy Planning Database (UK government), where it last changed on 15 February 2024.
- Where is Creyke Beck Substation - Solar Farm & Battery Storage?
- 6.8 km north-west of Kingston upon Hull, East Riding of Yorkshire, United Kingdom (postcode HU16 4AZ).
Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).