Planning pack for this site, £295Other options

Battery storage · United Kingdom

Creyke Beck Substation - Battery Storage

Operator Albanwise Synergy Limited · Owner Albanwise Holdings Limited

Awaiting ConstructionData checked 16 November 2026Source record dated 15 February 2024

Watch this siteIts outage notices and incidents, what it earns and where it ranks, in your workspace and by email. 7 days free, no card.

Creyke Beck Substation - Battery Storage is a battery storage site 6.8 km north-west of Kingston upon Hull, East Riding of Yorkshire, United Kingdom. Its planning application (23/03926/STPLF) went to East Riding of Yorkshire on 22 December 2023 and was granted on 25 March 2024. Its status in the Renewable Energy Planning Database (UK government) is awaiting construction. There are 63 other energy sites within 10 km, 13 of them battery storage sites (hybrid battery and solar sites included). The register holds no incident at this site. It holds 14 incidents at battery storage sites (hybrid battery and solar sites included) in the United Kingdom, and 199 worldwide.

ALBANWISE SYNERGY LIMITED (12275361), active, since 2019. 2 outstanding charges on the register. Members see the charges register: each charge, when it was created and the lender it is in favour of.

Source: Companies House, matched by the operator's name. If this is the wrong company, tell the editor.

Preparing, reviewing or responding to a planning application for a site like this? The planning evidence pack for Creyke Beck Substation - Battery Storage sets out every comparable incident for this project, with sources. £295, by email in minutes; the order form arrives filled in from this record.

Get the evidence pack for this site, £295 See a sample pack (PDF)

The pack for this site lists 5 comparable battery incidents in the United Kingdom, grid-scale only, nearest first. The nearest is EIR-0584, Fire in a battery container at Rufford Colliery BESS, Rainworth; owner attributes it to a short circuit in NMC cells, 87 km from this site.

ReferenceYearIncidentFrom the siteSeverity
EIR-05842026Fire in a battery container at Rufford Colliery BESS, Rainworth; owner attributes it to a short circuit in NMC cells87 kmSignificant
EIR-06382020Explosion and prolonged fire at Orsted battery storage site in Liverpool170 kmMajor
EIR-00582025Fire in two battery containers at Cirencester Hybrid Solar Farm, Gloucestershire251 kmSignificant
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••

The first 3 rows as the pack shows them. The other 2 are in the pack, each with its distance, sources and the fire service guidance it bears on.

The map

Summary for this site

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

Paragraphs for the planning statement

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

In the full pack
Technology
Battery storage (Stand-alone Storage)
Status
Awaiting Construction (Planning Permission Granted)
Operator or applicant
Albanwise Synergy Limited
Owner
Albanwise Holdings Limited
Location
S/O Creyke Beck Substation, 4875 Park Lane, Cottingham, East Riding of Yorkshire, HU16 4AZ, United Kingdom
Planning authority
East Riding of Yorkshire
Planning application
23/03926/STPLF

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

The planning application page for 23/03926/STPLF, with what the planning evidence pack adds for this site.

Every application in East Riding of Yorkshire · Alerts for applications and incidents near here

  • 22 December 2023 Planning application submitted
  • 25 March 2024 Planning permission granted
  • 25 March 2027 Planning permission runs out

None found. The register holds no published incident that names Creyke Beck Substation - Battery Storage. If you know of one, report it (confidential reports are anonymised).

Has Creyke Beck Substation - Battery Storage had a fire or other incident?
None is on the register as of 21 November 2026. The register holds no published incident that names Creyke Beck Substation - Battery Storage; it holds 14 incidents at battery storage sites (hybrid battery and solar sites included) in the United Kingdom.
What is the status of Creyke Beck Substation - Battery Storage?
Awaiting Construction, in the Renewable Energy Planning Database (UK government), where it last changed on 15 February 2024.
Where is Creyke Beck Substation - Battery Storage?
6.8 km north-west of Kingston upon Hull, East Riding of Yorkshire, United Kingdom (postcode HU16 4AZ).

Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).