← Back to Highland
Planning pack for this site, £295Other options

Onshore wind · United Kingdom

Creag Riabhach Wind Farm Extension & Battery Storage

Operator Creag Riabhach Wind Farm Limited

Awaiting Construction12.6 MWData checked 16 November 2026Source record dated 10 July 2024

Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.

Creag Riabhach Wind Farm Extension & Battery Storage is a 12.6 MW wind farm 60 km north of Alness, Highland, United Kingdom. Its planning application (ECU00004487) went to Scottish Government (S36) on 10 May 2022 and was granted on 5 July 2024. Its status in the Renewable Energy Planning Database (UK government) is awaiting construction. There are 2 other energy sites within 10 km, one of them a wind farm. The register holds no incident at this site. It holds 63 incidents at wind farms in the United Kingdom, and 362 worldwide.

Preparing, reviewing or responding to a planning application for a site like this? The planning evidence pack for Creag Riabhach Wind Farm Extension & Battery Storage sets out every comparable incident for this project, with sources. £295, by email in minutes; the order form arrives filled in from this record.

Get the evidence pack for this site, £295 See a sample pack (PDF)

The pack for this site lists 5 comparable battery incidents in the United Kingdom, grid-scale only, nearest first. The nearest is EIR-0638, Explosion and prolonged fire at Orsted battery storage site in Liverpool, 545 km from this site.

ReferenceYearIncidentFrom the siteSeverity
EIR-06382020Explosion and prolonged fire at Orsted battery storage site in Liverpool545 kmMajor
EIR-05842026Fire in a battery container at Rufford Colliery BESS, Rainworth; owner attributes it to a short circuit in NMC cells605 kmSignificant
EIR-00582025Fire in two battery containers at Cirencester Hybrid Solar Farm, Gloucestershire741 kmSignificant
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••

The first 3 rows as the pack shows them. The other 2 are in the pack, each with its distance, sources and the fire service guidance it bears on.

The map

Summary for this site

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

Paragraphs for the planning statement

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

In the full pack
Technology
Onshore wind
Capacity
12.6 MW
Capacity figure from
Renewable Energy Planning Database (UK government)
Status
Awaiting Construction (Planning Permission Granted)
Operator or applicant
Creag Riabhach Wind Farm Limited
Location
Creag Riabhach Wind Farm, Creag Riabhach, Lairg, Highland, IV27 4AD, United Kingdom
Planning authority
Scottish Government (S36)
Planning application
ECU00004487
Turbines
3, 149.9 m to tip

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

The planning application page for ECU00004487, with what the planning evidence pack adds for this site.

Every application in Scottish Government (S36) · Alerts for applications and incidents near here

  • 10 May 2022 Planning application submitted
  • 5 July 2024 Planning permission granted
  • 5 July 2029 Planning permission runs out

None found. The register holds no published incident that names Creag Riabhach Wind Farm Extension & Battery Storage. If you know of one, report it (confidential reports are anonymised).

Has Creag Riabhach Wind Farm Extension & Battery Storage had a fire or other incident?
None is on the register as of 21 November 2026. The register holds no published incident that names Creag Riabhach Wind Farm Extension & Battery Storage; it holds 63 incidents at wind farms in the United Kingdom.
What is the status of Creag Riabhach Wind Farm Extension & Battery Storage?
Awaiting Construction, in the Renewable Energy Planning Database (UK government), where it last changed on 10 July 2024.
Where is Creag Riabhach Wind Farm Extension & Battery Storage?
60 km north of Alness, Highland, United Kingdom (postcode IV27 4AD).

Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).