Chleansaid Onshore Wind Farm

Operator ESB

Awaiting Construction20 MWData checked 16 November 2026Source record dated 9 January 2024

Watch this siteIts outage notices and incidents, what it earns and where it ranks, in your workspace and by email. 7 days free, no card.

Chleansaid Onshore Wind Farm is a 20 MW battery storage site 47 km north of Alness, Highland, United Kingdom. Its planning application (ECU00002031) went to Scottish Government (S36) on 30 March 2022 and was granted on 15 December 2023. Its status in the Renewable Energy Planning Database (UK government) is awaiting construction. There are 9 other energy sites within 10 km, 2 of them battery storage sites (hybrid battery and solar sites included). The register holds no incident at this site. It holds 14 incidents at battery storage sites (hybrid battery and solar sites included) in the United Kingdom, and 199 worldwide.

Preparing, reviewing or responding to a planning application for a site like this? The planning evidence pack for Chleansaid Onshore Wind Farm sets out every comparable incident for this project, with sources. £295, by email in minutes; the order form arrives filled in from this record.

Get the evidence pack for this site, £295 See a sample pack (PDF)

The pack for this site lists 5 comparable battery incidents in the United Kingdom, grid-scale only, nearest first. The nearest is EIR-0638, Explosion and prolonged fire at Orsted battery storage site in Liverpool, 533 km from this site.

ReferenceYearIncidentFrom the siteSeverity
EIR-06382020Explosion and prolonged fire at Orsted battery storage site in Liverpool533 kmMajor
EIR-05842026Fire in a battery container at Rufford Colliery BESS, Rainworth; owner attributes it to a short circuit in NMC cells592 kmSignificant
EIR-00582025Fire in two battery containers at Cirencester Hybrid Solar Farm, Gloucestershire729 kmSignificant
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••

The first 3 rows as the pack shows them. The other 2 are in the pack, each with its distance, sources and the fire service guidance it bears on.

The map

Summary for this site

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

Paragraphs for the planning statement

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

In the full pack
Technology
Battery storage (Co-located with RE)
Capacity
20 MW
Capacity figure from
Renewable Energy Planning Database (UK government)
Status
Awaiting Construction (Planning Permission Granted)
Operator or applicant
ESB
Location
Dalnessie Estate, approximately 13 km northeast of Lairg, Highland, United Kingdom
Planning authority
Scottish Government (S36)
Planning application
ECU00002031

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

The planning application page for ECU00002031, with what the planning evidence pack adds for this site.

Every application in Scottish Government (S36) · Alerts for applications and incidents near here

  • 30 March 2022 Planning application submitted
  • 15 December 2023 Planning permission granted
  • 15 December 2026 Planning permission runs out

None found. The register holds no published incident that names Chleansaid Onshore Wind Farm. If you know of one, report it (confidential reports are anonymised).

Has Chleansaid Onshore Wind Farm had a fire or other incident?
None is on the register as of 21 November 2026. The register holds no published incident that names Chleansaid Onshore Wind Farm; it holds 14 incidents at battery storage sites (hybrid battery and solar sites included) in the United Kingdom.
What is the status of Chleansaid Onshore Wind Farm?
Awaiting Construction, in the Renewable Energy Planning Database (UK government), where it last changed on 9 January 2024.
Where is Chleansaid Onshore Wind Farm?
47 km north of Alness, Highland, United Kingdom.