Solar · United Kingdom
Cotmoor Lane
Operator JBM Solar
Awaiting Construction49.9 MWData checked 16 November 2026Source record dated 18 February 2022
Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.
Cotmoor Lane is a 49.9 MW solar farm on the edge of Southwell, Nottinghamshire, United Kingdom. Its planning application (20/01242/FULM) went to Newark and Sherwood on 10 July 2020 and was granted on appeal on 18 February 2022. Its status in the Renewable Energy Planning Database (UK government) is awaiting construction. There are 23 other energy sites within 10 km, 11 of them solar farms (hybrid battery and solar sites included). The register holds no incident at this site. It holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom, and 480 worldwide.
Get an email when Cotmoor Lane changes
Free. An email when its status changes: a planning decision, building starting, going live or closing. And each Monday, solar PV incidents in the United Kingdom. No account needed; unsubscribe in one click.
Confirm your email and every solar incident on the register arrives at once as a spreadsheet (CSV), free.
Get a free sample brief Three complete verified records and the incidents-per-GW table, by email within a minute.
We will also email you about the register's paid records and plans, at most once a week and three times in all. You can stop these at any time. By signing up you agree to the privacy policy.
Preparing, reviewing or responding to a planning application for a site like this? The planning evidence pack for Cotmoor Lane sets out every comparable incident for this project, with sources. £295, by email in minutes; the order form arrives filled in from this record.
Get the evidence pack for this site, £295 See a sample pack (PDF)
Preview of the planning evidence pack for this site
The pack for this site lists 104 comparable solar incidents in the United Kingdom, nearest first. The nearest is EIR-1265, Solar panels catch fire and destroy three buildings in Harby, 22 km from this site.
| Reference | Year | Incident | From the site | Severity |
|---|---|---|---|---|
| EIR-1265 | 2024 | Solar panels catch fire and destroy three buildings in Harby | 22 km | Significant |
| EIR-0764 | 2024 | Transformer smoking at solar farm in Burton Pedwardine | 45 km | Minor |
| EIR-1552 | 2023 | Fire starts in solar panels on commercial roof in Doncaster | 47 km | Significant |
| •••••••• | •••• | •••••••••••••••••••••••••••••• | •••• | •••••• |
| •••••••• | •••• | •••••••••••••••••••••••••••••• | •••• | •••••• |
| •••••••• | •••• | •••••••••••••••••••••••••••••• | •••• | •••••• |
| •••••••• | •••• | •••••••••••••••••••••••••••••• | •••• | •••••• |
| •••••••• | •••• | •••••••••••••••••••••••••••••• | •••• | •••••• |
The first 3 rows as the pack shows them. The other 101 are in the pack, each with its distance, sources and the fire service guidance it bears on.
The map
Summary for this site
This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.
Paragraphs for the planning statement
This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.
In the full packThe site
- Technology
- Solar
- Capacity
- 49.9 MW
- Capacity figure from
- Renewable Energy Planning Database (UK government)
- Status
- Awaiting Construction (Appeal Granted)
- Operator or applicant
- JBM Solar
- Location
- Land At, Cotmoor Lane, Southwell, Nottinghamshire, NG25 0QS, United Kingdom
- Planning authority
- Newark and Sherwood
- Planning application
- 20/01242/FULM
- Appeal reference
- APP/B3030/W/21/3279533
View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.
The planning application page for 20/01242/FULM, with what the planning evidence pack adds for this site.
Every application in Newark and Sherwood · Alerts for applications and incidents near here
Timeline
- 10 July 2020 Planning application submitted
- 4 March 2021 Planning permission refused
- 23 July 2021 Appeal lodged
- 18 February 2022 Planning permission granted
- 18 February 2022 Appeal granted
- 18 February 2025 Planning permission expired
Incidents on the register at this site
None found. The register holds no published incident that names Cotmoor Lane. If you know of one, report it (confidential reports are anonymised).
Questions
- Has Cotmoor Lane had a fire or other incident?
- None is on the register as of 21 November 2026. The register holds no published incident that names Cotmoor Lane; it holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom.
- What is the status of Cotmoor Lane?
- Awaiting Construction, in the Renewable Energy Planning Database (UK government), where it last changed on 18 February 2022.
- Where is Cotmoor Lane?
- On the edge of Southwell, Nottinghamshire, United Kingdom (postcode NG25 0QS).
Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).