Corinto Consorcio Cemig Sim Gd 1 solar project

Operational5 MWData checked 8 October 2026Source record dated 11 June 2025

Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.

Corinto Consorcio Cemig Sim Gd 1 solar project is a 5 MW solar farm in Corinto, Minas Gerais, Brazil. It first operated in 2020. Its status in the Global Energy Monitor solar and wind trackers is operational. There is one other energy site within 10 km. The register holds no incident at this site. It holds 18 incidents at solar farms (hybrid battery and solar sites included) in Brazil, and 480 worldwide.

1 energy site within 40 km for Corinto Consorcio Cemig Sim Gd 1 solar project

Members see the sites and incidents around this one, and every record behind them.

Technology
Solar
Capacity
5 MW
Capacity figure from
Global Energy Monitor solar and wind trackers
Status
Operational (Operating)
Location
Corinto, Minas Gerais, Brazil
First operating
2020
Phases in the tracker
5

View on OpenStreetMap (the tracker marks the position as approximate). The larger dot is this site; the others are sites within 40 km.

Alerts for applications and incidents near here

None found. The register holds no published incident that names Corinto Consorcio Cemig Sim Gd 1 solar project. If you know of one, report it (confidential reports are anonymised).

Own, insure or lend to this site or others like it? A portfolio safety record checks every site in a list against the register, free; the paid records add the site, operator, cause, downtime and loss behind each incident.

Has Corinto Consorcio Cemig Sim Gd 1 solar project had a fire or other incident?
None is on the register as of 22 November 2026. The register holds no published incident that names Corinto Consorcio Cemig Sim Gd 1 solar project; it holds 18 incidents at solar farms (hybrid battery and solar sites included) in Brazil.
What is the status of Corinto Consorcio Cemig Sim Gd 1 solar project?
Operational, in the Global Energy Monitor solar and wind trackers, where it last changed on 11 June 2025.
Where is Corinto Consorcio Cemig Sim Gd 1 solar project?
In Corinto, Minas Gerais, Brazil.

Source: Global Energy Monitor, Global Solar Power Tracker and Global Wind Power Tracker, licensed under CC BY 4.0. The dataset. This project on the GEM wiki. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).