Solar · United Kingdom
Cooper Vision, Speedwell Close - Solar Panels
Operator Ylem Energy Limited
Awaiting Construction0.6 MWData checked 16 November 2026Source record dated 26 November 2024
Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.
Cooper Vision, Speedwell Close - Solar Panels is a 0.6 MW solar farm 3.1 km west of Eastleigh, Hampshire, United Kingdom. Its planning application (PN/24/97952) went to Eastleigh on 2 August 2024 and was granted on 17 October 2024. Its status in the Renewable Energy Planning Database (UK government) is awaiting construction. There are 65 other energy sites within 10 km, 42 of them solar farms (hybrid battery and solar sites included). The register holds no incident at this site. It holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom, and 480 worldwide.
Get an email when Cooper Vision, Speedwell Close - Solar Panels changes
Free. An email when its status changes: a planning decision, building starting, going live or closing. And each Monday, solar PV incidents in the United Kingdom. No account needed; unsubscribe in one click.
Confirm your email and every solar incident on the register arrives at once as a spreadsheet (CSV), free.
Get a free sample brief Three complete verified records and the incidents-per-GW table, by email within a minute.
We will also email you about the register's paid records and plans, at most once a week and three times in all. You can stop these at any time. By signing up you agree to the privacy policy.
The company behind this site
YLEM ENERGY LIMITED (02152229), active, since 1987. No outstanding charges on the register. Members see the charges register: each charge, when it was created and the lender it is in favour of.
Source: Companies House, matched by the operator's name. If this is the wrong company, tell the editor.
Preparing, reviewing or responding to a planning application for a site like this? The planning evidence pack for Cooper Vision, Speedwell Close - Solar Panels sets out every comparable incident for this project, with sources. £295, by email in minutes; the order form arrives filled in from this record.
Get the evidence pack for this site, £295 See a sample pack (PDF)
Preview of the planning evidence pack for this site
The pack for this site lists 104 comparable solar incidents in the United Kingdom, nearest first. The nearest is EIR-1534, Storm Eunice loosens solar panels on Eastleigh flats, 2.9 km from this site.
| Reference | Year | Incident | From the site | Severity |
|---|---|---|---|---|
| EIR-1534 | 2022 | Storm Eunice loosens solar panels on Eastleigh flats | 2.9 km | Minor |
| EIR-1529 | 2023 | Fire contained to solar panels on Gosport flats roof | 28 km | Minor |
| EIR-2076 | 2020 | Fire across four homes in Leigh Park most likely linked to solar panel equipment, fire service says | 31 km | Significant |
| •••••••• | •••• | •••••••••••••••••••••••••••••• | •••• | •••••• |
| •••••••• | •••• | •••••••••••••••••••••••••••••• | •••• | •••••• |
| •••••••• | •••• | •••••••••••••••••••••••••••••• | •••• | •••••• |
| •••••••• | •••• | •••••••••••••••••••••••••••••• | •••• | •••••• |
| •••••••• | •••• | •••••••••••••••••••••••••••••• | •••• | •••••• |
The first 3 rows as the pack shows them. The other 101 are in the pack, each with its distance, sources and the fire service guidance it bears on.
The map
Summary for this site
This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.
Paragraphs for the planning statement
This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.
In the full packThe site
- Technology
- Solar
- Capacity
- 0.6 MW
- Capacity figure from
- Renewable Energy Planning Database (UK government)
- Status
- Awaiting Construction (Planning Permission Granted)
- Operator or applicant
- Ylem Energy Limited
- Location
- Coopervision Speedwell & Warrior Buildings, Erith House & Unit 1, Warrior Close & Speedwell Close, Chandlers Ford, Eastleigh, Hampshire, SO53 4TE, United Kingdom
- Planning authority
- Eastleigh
- Planning application
- PN/24/97952
View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.
The planning application page for PN/24/97952, with what the planning evidence pack adds for this site.
Every application in Eastleigh · Alerts for applications and incidents near here
Timeline
- 2 August 2024 Planning application submitted
- 17 October 2024 Planning permission granted
Incidents on the register at this site
None found. The register holds no published incident that names Cooper Vision, Speedwell Close - Solar Panels. If you know of one, report it (confidential reports are anonymised).
Questions
- Has Cooper Vision, Speedwell Close - Solar Panels had a fire or other incident?
- None is on the register as of 21 November 2026. The register holds no published incident that names Cooper Vision, Speedwell Close - Solar Panels; it holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom.
- What is the status of Cooper Vision, Speedwell Close - Solar Panels?
- Awaiting Construction, in the Renewable Energy Planning Database (UK government), where it last changed on 26 November 2024.
- Where is Cooper Vision, Speedwell Close - Solar Panels?
- 3.1 km west of Eastleigh, Hampshire, United Kingdom (postcode SO53 4TE).
Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).