Chandlers Ford - Solar panels
Operator Geo Green Power Limited
Awaiting Construction0.2 MWData checked 16 November 2026Source record dated 23 May 2022
Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.
Chandlers Ford - Solar panels is a 0.2 MW solar farm on the edge of Eastleigh, Hampshire, United Kingdom. Its planning application (PN/22/92652) went to Eastleigh on 9 May 2022 and was granted on 20 June 2022. Its status in the Renewable Energy Planning Database (UK government) is awaiting construction. There are 68 other energy sites within 10 km, 44 of them solar farms (hybrid battery and solar sites included). The register holds no incident at this site. It holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom, and 480 worldwide.
Get an email when Chandlers Ford - Solar panels changes
Free. An email when its status changes: a planning decision, building starting, going live or closing. And each Monday, solar PV incidents in the United Kingdom. No account needed; unsubscribe in one click.
Confirm your email and every solar incident on the register arrives at once as a spreadsheet (CSV), free.
Get a free sample brief Three complete verified records and the incidents-per-GW table, by email within a minute.
We will also email you about the register's paid records and plans, at most once a week and three times in all. You can stop these at any time. By signing up you agree to the privacy policy.
Preparing, reviewing or responding to a planning application for a site like this? The planning evidence pack for Chandlers Ford - Solar panels sets out every comparable incident for this project, with sources. £295, by email in minutes; the order form arrives filled in from this record.
Get the evidence pack for this site, £295 See a sample pack (PDF)
Preview of the planning evidence pack for this site
The pack for this site lists 104 comparable solar incidents in the United Kingdom, nearest first. The nearest is EIR-1534, Storm Eunice loosens solar panels on Eastleigh flats, 2.5 km from this site.
| Reference | Year | Incident | From the site | Severity |
|---|---|---|---|---|
| EIR-1534 | 2022 | Storm Eunice loosens solar panels on Eastleigh flats | 2.5 km | Minor |
| EIR-1529 | 2023 | Fire contained to solar panels on Gosport flats roof | 27 km | Minor |
| EIR-2076 | 2020 | Fire across four homes in Leigh Park most likely linked to solar panel equipment, fire service says | 30 km | Significant |
| •••••••• | •••• | •••••••••••••••••••••••••••••• | •••• | •••••• |
| •••••••• | •••• | •••••••••••••••••••••••••••••• | •••• | •••••• |
| •••••••• | •••• | •••••••••••••••••••••••••••••• | •••• | •••••• |
| •••••••• | •••• | •••••••••••••••••••••••••••••• | •••• | •••••• |
| •••••••• | •••• | •••••••••••••••••••••••••••••• | •••• | •••••• |
The first 3 rows as the pack shows them. The other 101 are in the pack, each with its distance, sources and the fire service guidance it bears on.
The map
Summary for this site
This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.
Paragraphs for the planning statement
This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.
In the full packThe site
- Technology
- Solar
- Capacity
- 0.2 MW
- Capacity figure from
- Renewable Energy Planning Database (UK government)
- Status
- Awaiting Construction (Planning Permission Granted)
- Operator or applicant
- Geo Green Power Limited
- Location
- 1 Stoneycroft Rise, Chandler's Ford, Eastleigh, Hampshire, SO53 3YU, United Kingdom
- Planning authority
- Eastleigh
- Planning application
- PN/22/92652
View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.
The planning application page for PN/22/92652, with what the planning evidence pack adds for this site.
Every application in Eastleigh · Alerts for applications and incidents near here
Timeline
- 9 May 2022 Planning application submitted
- 20 June 2022 Planning permission granted
Incidents on the register at this site
None found. The register holds no published incident that names Chandlers Ford - Solar panels. If you know of one, report it (confidential reports are anonymised).
Questions
- Has Chandlers Ford - Solar panels had a fire or other incident?
- None is on the register as of 21 November 2026. The register holds no published incident that names Chandlers Ford - Solar panels; it holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom.
- What is the status of Chandlers Ford - Solar panels?
- Awaiting Construction, in the Renewable Energy Planning Database (UK government), where it last changed on 23 May 2022.
- Where is Chandlers Ford - Solar panels?
- On the edge of Eastleigh, Hampshire, United Kingdom (postcode SO53 3YU).
Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).