Solar · United Kingdom

Colleen Farm

Operator Bowler Energy

Abandoned2.2 MWData checked 16 November 2026Source record dated 25 October 2016

Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.

Colleen Farm is a 2.2 MW solar farm 7.5 km south of Totnes, Devon, United Kingdom. Its planning application (22/1610/14/F) went to South Hams on 25 June 2014 and was granted on 26 March 2015. Its status in the Renewable Energy Planning Database (UK government) is abandoned. There are 19 other energy sites within 10 km, 13 of them solar farms (hybrid battery and solar sites included). The register holds no incident at this site. It holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom, and 480 worldwide.

The operator's 1 other site and 151 energy sites within 40 km for Colleen Farm

Members see the sites and incidents around this one, and every record behind them.

Technology
Solar
Capacity
2.2 MW
Capacity figure from
Renewable Energy Planning Database (UK government)
Status
Abandoned
Operator or applicant
Bowler Energy
Location
Colleen Farm, Blackawton, Totnes, Devon, TQ9 7DW, United Kingdom
Planning authority
South Hams
Planning application
22/1610/14/F

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

The planning application page for 22/1610/14/F, with what the planning evidence pack adds for this site.

Every application in South Hams · Alerts for applications and incidents near here

  • 25 June 2014 Planning application submitted
  • 26 March 2015 Planning permission granted
  • 26 March 2018 Planning permission expired

None found. The register holds no published incident that names Colleen Farm. If you know of one, report it (confidential reports are anonymised).

Own, insure or lend to this site or others like it? A portfolio safety record checks every site in a list against the register, free; the paid records add the site, operator, cause, downtime and loss behind each incident.

Has Colleen Farm had a fire or other incident?
None is on the register as of 21 November 2026. The register holds no published incident that names Colleen Farm; it holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom.
What is the status of Colleen Farm?
Abandoned, in the Renewable Energy Planning Database (UK government), where it last changed on 25 October 2016.
Where is Colleen Farm?
7.5 km south of Totnes, Devon, United Kingdom (postcode TQ9 7DW).

Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).