Around this site

← Back to Coahuila

Solar · Mexico

Cola De León PV solar farm

Cancelled (shelved)150 MWChecked 8 October 2026Last changed in the dataset 23 January 2025

Technology
Solar
Capacity
150 MW
Status
Cancelled (shelved) (Shelved)
Operator
Fisterra Energy
Owner
Fisterra Energy [100%]
Location
San Pedro de las Colonias, Parras de la Fuente, Coahuila, Mexico

View on OpenStreetMap (the tracker marks the position as approximate). The larger dot is this site; the others are sites within 40 km.

None found. The register holds no published incident that names Cola De León PV solar farm. If you know of one, report it (confidential reports are anonymised).

Own, insure or lend to this site or others like it? A portfolio safety record checks every site in a list against the register, free; the paid records add the site, operator, cause, downtime and loss behind each incident.

Source: Global Energy Monitor, Global Solar Power Tracker and Global Wind Power Tracker, licensed under CC BY 4.0. The dataset. This project on the GEM wiki. The register adds only the incidents and the counts.