Battery storage · United Kingdom

Cleveland Potash

Operator Kiwi Power · Owner Kiwi Power LTD

Operational6 MWData checked 16 November 2026Source record dated 16 May 2019

Watch this siteIts outage notices and incidents, what it earns and where it ranks, in your workspace and by email. 7 days free, no card.

Cleveland Potash is a 6 MW battery storage site 7.7 km east of Brotton, North Yorkshire, United Kingdom. Its planning application (NYM/2015/0922/FL) went to Redcar and Cleveland on 7 January 2016 and was granted on 2 March 2016. It has been operating since 1 October 2017. Its status in the Renewable Energy Planning Database (UK government) is operational. There is one other energy site within 10 km. The register holds no incident at this site. It holds 14 incidents at battery storage sites (hybrid battery and solar sites included) in the United Kingdom, and 199 worldwide.

The operator's 1 other site and 149 energy sites within 40 km for Cleveland Potash

Members see the sites and incidents around this one, and every record behind them.

KIWI POWER LTD (07104653), active, since 2009. No outstanding charges on the register. Members see the charges register: each charge, when it was created and the lender it is in favour of.

Source: Companies House, matched by the operator's name. If this is the wrong company, tell the editor.

Technology
Battery storage (Stand-alone Storage)
Capacity
6 MW
Capacity figure from
Renewable Energy Planning Database (UK government)
Status
Operational
Operator or applicant
Kiwi Power
Owner
Kiwi Power LTD
Location
Boulby Mine, Loftus, Saltburn-by-the-Sea, Cleveland, North Yorkshire, TS13 4UZ, United Kingdom
Planning authority
Redcar and Cleveland
Planning application
NYM/2015/0922/FL
First operating
2017

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

The planning application page for NYM/2015/0922/FL, with what the planning evidence pack adds for this site.

Every application in Redcar and Cleveland · Alerts for applications and incidents near here

  • 7 January 2016 Planning application submitted
  • 2 March 2016 Planning permission granted
  • 1 June 2017 Construction started
  • 1 October 2017 Operational

None found. The register holds no published incident that names Cleveland Potash. If you know of one, report it (confidential reports are anonymised).

Own, insure or lend to this site or others like it? A portfolio safety record checks every site in a list against the register, free; the paid records add the site, operator, cause, downtime and loss behind each incident.

Has Cleveland Potash had a fire or other incident?
None is on the register as of 21 November 2026. The register holds no published incident that names Cleveland Potash; it holds 14 incidents at battery storage sites (hybrid battery and solar sites included) in the United Kingdom.
What is the status of Cleveland Potash?
Operational, in the Renewable Energy Planning Database (UK government), where it last changed on 16 May 2019.
Where is Cleveland Potash?
7.7 km east of Brotton, North Yorkshire, United Kingdom (postcode TS13 4UZ).

Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).