Onshore wind · United Kingdom
Cleek Hall
Operator Dillon Butters
Abandoned15 MWData checked 16 November 2026Source record dated 29 September 2015
Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.
Cleek Hall is a 15 MW wind farm 3.7 km east of Selby, North Yorkshire, United Kingdom. Its planning application (2009/0744/EIA) went to North Yorkshire on 17 August 2009 and was granted on appeal on 18 September 2012. Its status in the Renewable Energy Planning Database (UK government) is abandoned. There are 47 other energy sites within 10 km, 4 of them wind farms. The register holds no incident at this site. It holds 63 incidents at wind farms in the United Kingdom, and 362 worldwide.
Get an email when Cleek Hall changes
Free. An email when its status changes: a planning decision, building starting, going live or closing. And each Monday, onshore wind incidents in the United Kingdom. No account needed; unsubscribe in one click.
Confirm your email and every wind turbine incident on the register arrives at once as a spreadsheet (CSV), free.
Get a free sample brief Three complete verified records and the incidents-per-GW table, by email within a minute.
We will also email you about the register's paid records and plans, at most once a week and three times in all. You can stop these at any time. By signing up you agree to the privacy policy.
Members see the sites and incidents around this one, and every record behind them.
The site
- Technology
- Onshore wind
- Capacity
- 15 MW
- Capacity figure from
- Renewable Energy Planning Database (UK government)
- Status
- Abandoned
- Operator or applicant
- Dillon Butters
- Location
- Turnham Lane, Cliffe, Selby, North Yorkshire, North Yorkshire, United Kingdom
- Planning authority
- North Yorkshire
- Planning application
- 2009/0744/EIA
- Appeal reference
- AP/2012/0008/REF
- Turbines
- 5
View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.
The planning application page for 2009/0744/EIA, with what the planning evidence pack adds for this site.
Every application in North Yorkshire · Alerts for applications and incidents near here
Timeline
- 17 August 2009 Planning application submitted
- 9 November 2011 Planning permission refused
- 18 September 2012 Planning permission granted
- 18 September 2012 Appeal granted
- 18 September 2017 Planning permission expired
Incidents on the register at this site
None found. The register holds no published incident that names Cleek Hall. If you know of one, report it (confidential reports are anonymised).
Own, insure or lend to this site or others like it? A portfolio safety record checks every site in a list against the register, free; the paid records add the site, operator, cause, downtime and loss behind each incident.
Questions
- Has Cleek Hall had a fire or other incident?
- None is on the register as of 21 November 2026. The register holds no published incident that names Cleek Hall; it holds 63 incidents at wind farms in the United Kingdom.
- What is the status of Cleek Hall?
- Abandoned, in the Renewable Energy Planning Database (UK government), where it last changed on 29 September 2015.
- Where is Cleek Hall?
- 3.7 km east of Selby, North Yorkshire, United Kingdom.
Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).