Solar · United Kingdom
Clannell Road Tesco (Northampton South)
Operator Push Energy · Owner Push Renewco Limited
Awaiting Construction0.4 MWData checked 16 November 2026Source record dated 11 May 2023
Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.
Clannell Road Tesco (Northampton South) is a 0.4 MW solar farm on the edge of Hardingstone, Northamptonshire, United Kingdom. Its planning application (N/2020/0027) went to West Northamptonshire on 28 January 2020 and was granted on 23 March 2020. Its status in the Renewable Energy Planning Database (UK government) is awaiting construction. There are 43 other energy sites within 10 km, 35 of them solar farms (hybrid battery and solar sites included). The register holds no incident at this site. It holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom, and 480 worldwide.
Get an email when Clannell Road Tesco (Northampton South) changes
Free. An email when its status changes: a planning decision, building starting, going live or closing. And each Monday, solar PV incidents in the United Kingdom. No account needed; unsubscribe in one click.
Confirm your email and every solar incident on the register arrives at once as a spreadsheet (CSV), free.
Get a free sample brief Three complete verified records and the incidents-per-GW table, by email within a minute.
We will also email you about the register's paid records and plans, at most once a week and three times in all. You can stop these at any time. By signing up you agree to the privacy policy.
The company behind this site
PUSH ENERGY LIMITED (11963582), active, since 2019. No outstanding charges on the register. Members see the charges register: each charge, when it was created and the lender it is in favour of.
Source: Companies House, matched by the operator's name. If this is the wrong company, tell the editor.
Preparing, reviewing or responding to a planning application for a site like this? The planning evidence pack for Clannell Road Tesco (Northampton South) sets out every comparable incident for this project, with sources. £295, by email in minutes; the order form arrives filled in from this record.
Get the evidence pack for this site, £295 See a sample pack (PDF)
Preview of the planning evidence pack for this site
The pack for this site lists 104 comparable solar incidents in the United Kingdom, nearest first. The nearest is EIR-1448, Roof fire at new-build house with solar panels in Wellingborough, 18 km from this site.
| Reference | Year | Incident | From the site | Severity |
|---|---|---|---|---|
| EIR-1448 | 2026 | Roof fire at new-build house with solar panels in Wellingborough | 18 km | Significant |
| EIR-1545 | 2024 | Fire involving solar panels on a building under construction in Kettering | 24 km | Minor |
| EIR-1554 | 2026 | Fire involving solar panels at a Market Harborough house spreads to an adjoining property | 31 km | Significant |
| •••••••• | •••• | •••••••••••••••••••••••••••••• | •••• | •••••• |
| •••••••• | •••• | •••••••••••••••••••••••••••••• | •••• | •••••• |
| •••••••• | •••• | •••••••••••••••••••••••••••••• | •••• | •••••• |
| •••••••• | •••• | •••••••••••••••••••••••••••••• | •••• | •••••• |
| •••••••• | •••• | •••••••••••••••••••••••••••••• | •••• | •••••• |
The first 3 rows as the pack shows them. The other 101 are in the pack, each with its distance, sources and the fire service guidance it bears on.
The map
Summary for this site
This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.
Paragraphs for the planning statement
This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.
In the full packThe site
- Technology
- Solar
- Capacity
- 0.4 MW
- Capacity figure from
- Renewable Energy Planning Database (UK government)
- Status
- Awaiting Construction (Planning Permission Granted)
- Operator or applicant
- Push Energy
- Owner
- Push Renewco Limited
- Location
- Tesco Superstore, Hunsbury Centre, Clannell Road, Northampton, Northamptonshire, Northamptonshire, NN4 0JF, United Kingdom
- Planning authority
- West Northamptonshire
- Planning application
- N/2020/0027
View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.
The planning application page for N/2020/0027, with what the planning evidence pack adds for this site.
Every application in West Northamptonshire · Alerts for applications and incidents near here
Timeline
- 28 January 2020 Planning application submitted
- 23 March 2020 Planning permission granted
Incidents on the register at this site
None found. The register holds no published incident that names Clannell Road Tesco (Northampton South). If you know of one, report it (confidential reports are anonymised).
Questions
- Has Clannell Road Tesco (Northampton South) had a fire or other incident?
- None is on the register as of 21 November 2026. The register holds no published incident that names Clannell Road Tesco (Northampton South); it holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom.
- What is the status of Clannell Road Tesco (Northampton South)?
- Awaiting Construction, in the Renewable Energy Planning Database (UK government), where it last changed on 11 May 2023.
- Where is Clannell Road Tesco (Northampton South)?
- On the edge of Hardingstone, Northamptonshire, United Kingdom (postcode NN4 0JF).
Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).