Onshore wind · Germany

Charlottenhof Repowering

Operator NWE Niederschlesische Windenergie & Co. Repowering Ludwigsdorf II KG

Planned57.6 MWData checked 10 November 2026

Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.

Charlottenhof Repowering is a 57.6 MW wind farm 5.1 km north of Görlitz, Germany. It first operated in 2029. Its status in the Marktstammdatenregister (Bundesnetzagentur, Germany) is planned. There are 20 other energy sites within 10 km, 13 of them wind farms. The register holds no incident at this site. It holds 30 incidents at wind farms in Germany, and 350 worldwide.

Preparing, reviewing or responding to a planning application for a site like this? The planning evidence pack for Charlottenhof Repowering sets out every comparable incident for this project, with sources. £295, by email in minutes; the order form arrives filled in from this record.

Get the evidence pack for this site, £295 See a sample pack (PDF)

The pack for this site lists 24 comparable onshore wind incidents in Germany, nearest first. The nearest is EIR-1802, Wind turbine collapses in Mecklenburg-Vorpommern after storm damage, 329 km from this site.

ReferenceYearIncidentFrom the siteSeverity
EIR-18022023Wind turbine collapses in Mecklenburg-Vorpommern after storm damage329 kmSignificant
EIR-18042023Wind turbine reported to have collapsed after a wind gust in Rostock, Germany374 kmMajor
EIR-03462026Two workers die after work basket fall at Birstein wind turbine, Germany408 kmMajor
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••

The first 3 rows as the pack shows them. The other 21 are in the pack, each with its distance, sources and the fire service guidance it bears on.

The map

Summary for this site

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

Paragraphs for the planning statement

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

In the full pack
Technology
Onshore wind
Capacity
57.6 MW
Capacity figure from
Marktstammdatenregister (Bundesnetzagentur, Germany)
Status
Planned (In planning)
Operator
NWE Niederschlesische Windenergie & Co. Repowering Ludwigsdorf II KG
Location
Görlitz, Görlitz, Sachsen, 02828, Germany
First operating
2029
Turbines
8

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

Alerts for applications and incidents near here

None found. The register holds no published incident that names Charlottenhof Repowering. If you know of one, report it (confidential reports are anonymised).

Has Charlottenhof Repowering had a fire or other incident?
None is on the register as of 10 November 2026. The register holds no published incident that names Charlottenhof Repowering; it holds 30 incidents at wind farms in Germany.
What is the status of Charlottenhof Repowering?
Planned, in the Marktstammdatenregister (Bundesnetzagentur, Germany).
Where is Charlottenhof Repowering?
5.1 km north of Görlitz, Germany (postcode 02828).

Source: Marktstammdatenregister, Bundesnetzagentur, Datenlizenz Deutschland, Namensnennung, Version 2.0 (www.govdata.de/dl-de/by-2-0). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).