← Back to Michigan
Planning pack for this site, £295Other options

Solar · United States

Cedar Field Solar Park

Operator DTE Electric Company

Under construction145 MWData checked 12 November 2026

Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.

Cedar Field Solar Park is a 145 MW solar farm 43 km north-east of Mount Pleasant, Gladwin County, Michigan, United States. Its status in the U.S. Energy Information Administration, Form EIA-860M is under construction. There is one other energy site within 10 km. The register holds no incident at this site. It holds 168 incidents at solar farms (hybrid battery and solar sites included) in the United States, and 480 worldwide.

Preparing, reviewing or responding to a planning application for a site like this? The planning evidence pack for Cedar Field Solar Park sets out every comparable incident for this project, with sources. £295, by email in minutes; the order form arrives filled in from this record.

Get the evidence pack for this site, £295 See a sample pack (PDF)

The pack for this site lists 168 comparable solar incidents in the United States, nearest first. The nearest is EIR-1302, Solar panels start fire at Racine event venue, 294 km from this site.

ReferenceYearIncidentFrom the siteSeverity
EIR-13022017Solar panels start fire at Racine event venue294 kmMinor
EIR-11712026Rooftop solar panel fire prompts evacuation at Wisconsin IKEA store296 kmMinor
EIR-24522024Solar installer dies after fall from home roof in Gurnee324 kmMajor
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••

The first 3 rows as the pack shows them. The other 165 are in the pack, each with its distance, sources and the fire service guidance it bears on.

The map

Summary for this site

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

Paragraphs for the planning statement

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

In the full pack
Technology
Solar
Capacity
145 MW
Capacity figure from
U.S. Energy Information Administration, Form EIA-860M
Status
Under construction
Operator
DTE Electric Company
Owner
DTE Electric Company
Location
Gladwin County, Michigan, United States
Expected
2027
Balancing authority
MISO

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

Alerts for applications and incidents near here

None found. The register holds no published incident that names Cedar Field Solar Park. If you know of one, report it (confidential reports are anonymised).

Has Cedar Field Solar Park had a fire or other incident?
None is on the register as of 21 November 2026. The register holds no published incident that names Cedar Field Solar Park; it holds 168 incidents at solar farms (hybrid battery and solar sites included) in the United States.
What is the status of Cedar Field Solar Park?
Under construction, in the U.S. Energy Information Administration, Form EIA-860M.
Where is Cedar Field Solar Park?
43 km north-east of Mount Pleasant, Gladwin County, Michigan, United States.

Source: U.S. Energy Information Administration, Form EIA-860M (Preliminary Monthly Electric Generator Inventory). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).