Solar · United Kingdom

Cauldon Cement Works, Yelsway Lane - Solar Panels

Operator Regenerco Limited

Awaiting Construction0.5 MWData checked 16 November 2026Source record dated 14 January 2025

Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.

Cauldon Cement Works, Yelsway Lane - Solar Panels is a 0.5 MW solar farm 9.9 km north-east of Cheadle, Staffordshire, United Kingdom. Its planning application (SCC/24/0119/GPDO-PWA) went to Staffordshire Moorlands on 14 October 2024 and was granted on 10 December 2024. Its status in the Renewable Energy Planning Database (UK government) is awaiting construction. There are 3 other energy sites within 10 km. The register holds no incident at this site. It holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom, and 480 worldwide.

REGENERCO LTD (07027214), active, since 2009. 1 outstanding charge on the register. Members see the charges register: each charge, when it was created and the lender it is in favour of.

Source: Companies House, matched by the operator's name. If this is the wrong company, tell the editor.

Preparing, reviewing or responding to a planning application for a site like this? The planning evidence pack for Cauldon Cement Works, Yelsway Lane - Solar Panels sets out every comparable incident for this project, with sources. £295, by email in minutes; the order form arrives filled in from this record.

Get the evidence pack for this site, £295 See a sample pack (PDF)

The pack for this site lists 104 comparable solar incidents in the United Kingdom, nearest first. The nearest is EIR-1546, Solar panel isolation switch overheats in roof fire at a house in Bucknall, 18 km from this site.

ReferenceYearIncidentFrom the siteSeverity
EIR-15462025Solar panel isolation switch overheats in roof fire at a house in Bucknall18 kmMinor
EIR-14852026Faulty solar panel wiring sparks house fire in Stoke-on-Trent20 kmMinor
EIR-15532017Roof fire involving 14 solar panels attended in Shropshire44 kmMinor
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••

The first 3 rows as the pack shows them. The other 101 are in the pack, each with its distance, sources and the fire service guidance it bears on.

The map

Summary for this site

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

Paragraphs for the planning statement

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

In the full pack
Technology
Solar
Capacity
0.5 MW
Capacity figure from
Renewable Energy Planning Database (UK government)
Status
Awaiting Construction (Planning Permission Granted)
Operator or applicant
Regenerco Limited
Location
Cauldon Cement Works, Yelsway Lane, Cauldon, Stoke on Trent, Staffordshire, ST10 3EQ, United Kingdom
Planning authority
Staffordshire Moorlands
Planning application
SCC/24/0119/GPDO-PWA

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

The planning application page for SCC/24/0119/GPDO-PWA, with what the planning evidence pack adds for this site.

Every application in Staffordshire Moorlands · Alerts for applications and incidents near here

  • 14 October 2024 Planning application submitted
  • 10 December 2024 Planning permission granted

None found. The register holds no published incident that names Cauldon Cement Works, Yelsway Lane - Solar Panels. If you know of one, report it (confidential reports are anonymised).

Has Cauldon Cement Works, Yelsway Lane - Solar Panels had a fire or other incident?
None is on the register as of 21 November 2026. The register holds no published incident that names Cauldon Cement Works, Yelsway Lane - Solar Panels; it holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom.
What is the status of Cauldon Cement Works, Yelsway Lane - Solar Panels?
Awaiting Construction, in the Renewable Energy Planning Database (UK government), where it last changed on 14 January 2025.
Where is Cauldon Cement Works, Yelsway Lane - Solar Panels?
9.9 km north-east of Cheadle, Staffordshire, United Kingdom (postcode ST10 3EQ).

Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).