Castletown - Wind Farm

Operator Wind 2 Limited · Owner Boralex Limited

Application Submitted9.6 MWData checked 16 November 2026Source record dated 17 January 2025

Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.

Castletown - Wind Farm is a 9.6 MW wind farm 11 km south-east of Thurso, Highland, United Kingdom. Its planning application (24/04932/FUL) went to Highland on 12 December 2024. Its status in the Renewable Energy Planning Database (UK government) is application submitted. There are 27 other energy sites within 10 km, 15 of them wind farms. The register holds no incident at this site. It holds 63 incidents at wind farms in the United Kingdom, and 362 worldwide.

WIND 2 LIMITED (10276420), active, since 2016. No outstanding charges on the register. Members see the charges register: each charge, when it was created and the lender it is in favour of.

Source: Companies House, matched by the operator's name. If this is the wrong company, tell the editor.

Preparing, reviewing or responding to a planning application for a site like this? The planning evidence pack for Castletown - Wind Farm sets out every comparable incident for this project, with sources. £295, by email in minutes; the order form arrives filled in from this record.

Get the evidence pack for this site, £295 See a sample pack (PDF)

The pack for this site lists 49 comparable onshore wind incidents in the United Kingdom, nearest first. The nearest is EIR-0767, Nordex turbine fire prompts investigation at Scottish wind farm, 200 km from this site.

ReferenceYearIncidentFrom the siteSeverity
EIR-07672024Nordex turbine fire prompts investigation at Scottish wind farm200 kmSignificant
EIR-00632024Fatal fall from turbine nacelle during onshore wind maintenance, UK200 kmMajor
EIR-00322017Fatal fall during onshore wind turbine construction, inquiry findings on rescue arrangements and equipment200 kmMajor
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••

The first 3 rows as the pack shows them. The other 46 are in the pack, each with its distance, sources and the fire service guidance it bears on.

The map

Summary for this site

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

Paragraphs for the planning statement

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

In the full pack
Technology
Onshore wind
Capacity
9.6 MW
Capacity figure from
Renewable Energy Planning Database (UK government)
Status
Application Submitted (Planning Application Submitted)
Operator or applicant
Wind 2 Limited
Owner
Boralex Limited
Location
975M se/o Mains Of Durran Castletown, Highland, KW14, United Kingdom
Planning authority
Highland
Planning application
24/04932/FUL
Turbines
2, 149.9 m to tip

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

The planning application page for 24/04932/FUL, with what the planning evidence pack adds for this site.

Every application in Highland · Alerts for applications and incidents near here

  • 12 December 2024 Planning application submitted

None found. The register holds no published incident that names Castletown - Wind Farm. If you know of one, report it (confidential reports are anonymised).

Has Castletown - Wind Farm had a fire or other incident?
None is on the register as of 21 November 2026. The register holds no published incident that names Castletown - Wind Farm; it holds 63 incidents at wind farms in the United Kingdom.
What is the status of Castletown - Wind Farm?
Application Submitted, in the Renewable Energy Planning Database (UK government), where it last changed on 17 January 2025.
Where is Castletown - Wind Farm?
11 km south-east of Thurso, Highland, United Kingdom (postcode KW14).

Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).