Onshore wind · Spain

Casa Del Aire wind farm

Operational100 MWChecked 8 October 2026Last changed in the dataset 8 December 2021

Matched by the site's name in the entry's own reporting. If one is wrong, tell the editor.

Technology
Onshore wind
Capacity
100 MW
Status
Operational (Operating)
Operator
EACLM
Location
Bonillo, Albacete, Castilla-La Mancha, Spain
First operating
2008
Phases in the tracker
2

View on OpenStreetMap (the tracker marks the position as approximate). The larger dot is this site; the others are sites within 40 km.