Solar · United Kingdom
Carsebank Farm
Operator Carsebank Solar
Abandoned5 MWData checked 16 November 2026Source record dated 27 July 2020
Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.
Carsebank Farm is a 5 MW solar farm 4.7 km north-east of Forfar, Angus, United Kingdom. Its planning application (15/00863/FULL) went to Angus on 14 September 2015 and was granted on 4 December 2015. Its status in the Renewable Energy Planning Database (UK government) is abandoned. There are 28 other energy sites within 10 km, 13 of them solar farms (hybrid battery and solar sites included). The register holds no incident at this site. It holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom, and 480 worldwide.
Get an email when Carsebank Farm changes
Free. An email when its status changes: a planning decision, building starting, going live or closing. And each Monday, solar PV incidents in the United Kingdom. No account needed; unsubscribe in one click.
Confirm your email and every solar incident on the register arrives at once as a spreadsheet (CSV), free.
Get a free sample brief Three complete verified records and the incidents-per-GW table, by email within a minute.
We will also email you about the register's paid records and plans, at most once a week and three times in all. You can stop these at any time. By signing up you agree to the privacy policy.
Members see the sites and incidents around this one, and every record behind them.
The site
- Technology
- Solar
- Capacity
- 5 MW
- Capacity figure from
- Renewable Energy Planning Database (UK government)
- Status
- Abandoned
- Operator or applicant
- Carsebank Solar
- Location
- Land 950M North East Of Carsebank Farm, Carsebank, Forfar, Tayside, Angus, DD8 3NP, United Kingdom
- Planning authority
- Angus
- Planning application
- 15/00863/FULL
View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.
The planning application page for 15/00863/FULL, with what the planning evidence pack adds for this site.
Every application in Angus · Alerts for applications and incidents near here
Timeline
- 14 September 2015 Planning application submitted
- 4 December 2015 Planning permission granted
- 4 December 2018 Planning permission expired
Incidents on the register at this site
None found. The register holds no published incident that names Carsebank Farm. If you know of one, report it (confidential reports are anonymised).
Own, insure or lend to this site or others like it? A portfolio safety record checks every site in a list against the register, free; the paid records add the site, operator, cause, downtime and loss behind each incident.
Questions
- Has Carsebank Farm had a fire or other incident?
- None is on the register as of 21 November 2026. The register holds no published incident that names Carsebank Farm; it holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom.
- What is the status of Carsebank Farm?
- Abandoned, in the Renewable Energy Planning Database (UK government), where it last changed on 27 July 2020.
- Where is Carsebank Farm?
- 4.7 km north-east of Forfar, Angus, United Kingdom (postcode DD8 3NP).
Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).