Solar · Spain

Caravón solar farm

Planned (permitted)70 MWChecked 8 October 2026Last changed in the dataset 7 March 2025

Preparing, reviewing or responding to a planning application for a site like this? The planning evidence pack for Caravón solar farm sets out every comparable incident for this project, with sources. Launch price: £145 until 31 October (normally £295). By email in minutes; the order form arrives filled in from this record.

Technology
Solar
Capacity
70 MW
Status
Planned (permitted) (Pre-construction)
Operator
Caravón Solar
Owner
Ignis Energía SL [100%]
Location
Yunquera de Henares, Guadalajara, Castilla-La Mancha, Spain

View on OpenStreetMap (the tracker marks the position as approximate). The larger dot is this site; the others are sites within 40 km.

None found. The register holds no published incident that names Caravón solar farm. If you know of one, report it (confidential reports are anonymised).

Source: Global Energy Monitor, Global Solar Power Tracker and Global Wind Power Tracker, licensed under CC BY 4.0. The dataset. This project on the GEM wiki. The register adds only the incidents and the counts.