Solar · United Kingdom
Camp Farm, Knowle Hill - Solar Farm
Operator Ampyr Solar Europe
Awaiting Construction49.9 MWData checked 16 November 2026Source record dated 10 September 2025
Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.
Camp Farm, Knowle Hill - Solar Farm is a 49.9 MW solar farm 6.9 km south-east of Fazeley, Warwickshire, United Kingdom. Its planning application (PAP/2024/0586) went to North Warwickshire on 6 January 2025 and was granted on 18 August 2025. Its status in the Renewable Energy Planning Database (UK government) is awaiting construction. There are 41 other energy sites within 10 km, 28 of them solar farms (hybrid battery and solar sites included). The register holds no incident at this site. It holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom, and 480 worldwide.
Get an email when Camp Farm, Knowle Hill - Solar Farm changes
Free. An email when its status changes: a planning decision, building starting, going live or closing. And each Monday, solar PV incidents in the United Kingdom. No account needed; unsubscribe in one click.
Confirm your email and every solar incident on the register arrives at once as a spreadsheet (CSV), free.
Get a free sample brief Three complete verified records and the incidents-per-GW table, by email within a minute.
We will also email you about the register's paid records and plans, at most once a week and three times in all. You can stop these at any time. By signing up you agree to the privacy policy.
Preparing, reviewing or responding to a planning application for a site like this? The planning evidence pack for Camp Farm, Knowle Hill - Solar Farm sets out every comparable incident for this project, with sources. £295, by email in minutes; the order form arrives filled in from this record.
Get the evidence pack for this site, £295 See a sample pack (PDF)
Preview of the planning evidence pack for this site
The pack for this site lists 104 comparable solar incidents in the United Kingdom, nearest first. The nearest is EIR-1272, Fire in solar panel distribution board at Birmingham college, 16 km from this site.
| Reference | Year | Incident | From the site | Severity |
|---|---|---|---|---|
| EIR-1272 | 2022 | Fire in solar panel distribution board at Birmingham college | 16 km | Minor |
| EIR-2151 | 2018 | Sunlight reflected from a shed solar panel believed to have started a house fire in Thurnby Lodge | 42 km | Significant |
| EIR-1554 | 2026 | Fire involving solar panels at a Market Harborough house spreads to an adjoining property | 49 km | Significant |
| •••••••• | •••• | •••••••••••••••••••••••••••••• | •••• | •••••• |
| •••••••• | •••• | •••••••••••••••••••••••••••••• | •••• | •••••• |
| •••••••• | •••• | •••••••••••••••••••••••••••••• | •••• | •••••• |
| •••••••• | •••• | •••••••••••••••••••••••••••••• | •••• | •••••• |
| •••••••• | •••• | •••••••••••••••••••••••••••••• | •••• | •••••• |
The first 3 rows as the pack shows them. The other 101 are in the pack, each with its distance, sources and the fire service guidance it bears on.
The map
Summary for this site
This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.
Paragraphs for the planning statement
This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.
In the full packThe site
- Technology
- Solar
- Capacity
- 49.9 MW
- Capacity figure from
- Renewable Energy Planning Database (UK government)
- Status
- Awaiting Construction (Planning Permission Granted)
- Operator or applicant
- Ampyr Solar Europe
- Location
- 400 Metres W/O Camp Farm, Knowle Hill, Hurley, Atherstone, Warwickshire, CV9 2JF, United Kingdom
- Planning authority
- North Warwickshire
- Planning application
- PAP/2024/0586
View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.
The planning application page for PAP/2024/0586, with what the planning evidence pack adds for this site.
Every application in North Warwickshire · Alerts for applications and incidents near here
Timeline
- 6 January 2025 Planning application submitted
- 18 August 2025 Planning permission granted
- 18 August 2028 Planning permission runs out
Incidents on the register at this site
None found. The register holds no published incident that names Camp Farm, Knowle Hill - Solar Farm. If you know of one, report it (confidential reports are anonymised).
Questions
- Has Camp Farm, Knowle Hill - Solar Farm had a fire or other incident?
- None is on the register as of 21 November 2026. The register holds no published incident that names Camp Farm, Knowle Hill - Solar Farm; it holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom.
- What is the status of Camp Farm, Knowle Hill - Solar Farm?
- Awaiting Construction, in the Renewable Energy Planning Database (UK government), where it last changed on 10 September 2025.
- Where is Camp Farm, Knowle Hill - Solar Farm?
- 6.9 km south-east of Fazeley, Warwickshire, United Kingdom (postcode CV9 2JF).
Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).