Solar · United Kingdom

Aston Road, Aston - Solar Panels & Battery Energy Storage System

Operator Ampyr Solar Europe

Application Submitted40 MWData checked 16 November 2026Source record dated 4 September 2025

Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.

Aston Road, Aston - Solar Panels & Battery Energy Storage System is a 40 MW solar farm 5.4 km south of Witney, Oxfordshire, United Kingdom. Its planning application (25/01702/FUL) went to West Oxfordshire on 25 July 2025. Its status in the Renewable Energy Planning Database (UK government) is application submitted. There are 34 other energy sites within 10 km, 21 of them solar farms (hybrid battery and solar sites included). The register holds no incident at this site. It holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom, and 480 worldwide.

Preparing, reviewing or responding to a planning application for a site like this? The planning evidence pack for Aston Road, Aston - Solar Panels & Battery Energy Storage System sets out every comparable incident for this project, with sources. £295, by email in minutes; the order form arrives filled in from this record.

Get the evidence pack for this site, £295 See a sample pack (PDF)

The pack for this site lists 5 comparable battery incidents in the United Kingdom, grid-scale only, nearest first. The nearest is EIR-0058, Fire in two battery containers at Cirencester Hybrid Solar Farm, Gloucestershire, 29 km from this site.

ReferenceYearIncidentFrom the siteSeverity
EIR-00582025Fire in two battery containers at Cirencester Hybrid Solar Farm, Gloucestershire29 kmSignificant
EIR-01092025Fire in single battery unit at Thurrock BESS under construction136 kmSignificant
EIR-05842026Fire in a battery container at Rufford Colliery BESS, Rainworth; owner attributes it to a short circuit in NMC cells156 kmSignificant
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••

The first 3 rows as the pack shows them. The other 2 are in the pack, each with its distance, sources and the fire service guidance it bears on.

The map

Summary for this site

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

Paragraphs for the planning statement

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

In the full pack
Technology
Solar
Capacity
40 MW
Capacity figure from
Renewable Energy Planning Database (UK government)
Status
Application Submitted (Planning Application Submitted)
Operator or applicant
Ampyr Solar Europe
Location
West of Aston Road, Aston, Oxfordshire, OX18 2EU, United Kingdom
Planning authority
West Oxfordshire
Planning application
25/01702/FUL

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

The planning application page for 25/01702/FUL, with what the planning evidence pack adds for this site.

Every application in West Oxfordshire · Alerts for applications and incidents near here

  • 25 July 2025 Planning application submitted

None found. The register holds no published incident that names Aston Road, Aston - Solar Panels & Battery Energy Storage System. If you know of one, report it (confidential reports are anonymised).

Has Aston Road, Aston - Solar Panels & Battery Energy Storage System had a fire or other incident?
None is on the register as of 21 November 2026. The register holds no published incident that names Aston Road, Aston - Solar Panels & Battery Energy Storage System; it holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom.
What is the status of Aston Road, Aston - Solar Panels & Battery Energy Storage System?
Application Submitted, in the Renewable Energy Planning Database (UK government), where it last changed on 4 September 2025.
Where is Aston Road, Aston - Solar Panels & Battery Energy Storage System?
5.4 km south of Witney, Oxfordshire, United Kingdom (postcode OX18 2EU).

Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).