← Back to West Lothian
Planning pack for this site, £295Other options

Onshore wind · United Kingdom

Camilty Plantation - Wind Farm

Operator EDF Energy Renewables

Awaiting Construction25.8 MWData checked 16 November 2026Source record dated 25 March 2022

Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.

Camilty Plantation - Wind Farm is a 25.8 MW wind farm 9.5 km south of Livingston, West Lothian, United Kingdom. Its planning application (0320/FUL/21) went to West Lothian on 13 April 2021 and was granted on 5 October 2021. Its status in the Renewable Energy Planning Database (UK government) is awaiting construction. There are 32 other energy sites within 10 km, 18 of them wind farms. The register holds no incident at this site. It holds 63 incidents at wind farms in the United Kingdom, and 362 worldwide.

EDF ENERGY RENEWABLES LIMITED (06456689), active, since 2007. No outstanding charges on the register. Members see the charges register: each charge, when it was created and the lender it is in favour of.

Source: Companies House, matched by the operator's name. If this is the wrong company, tell the editor.

Preparing, reviewing or responding to a planning application for a site like this? The planning evidence pack for Camilty Plantation - Wind Farm sets out every comparable incident for this project, with sources. £295, by email in minutes; the order form arrives filled in from this record.

Get the evidence pack for this site, £295 See a sample pack (PDF)

The pack for this site lists 49 comparable onshore wind incidents in the United Kingdom, nearest first. The nearest is EIR-0911, Worker dies after fall from turbine at Whitelee windfarm near Glasgow, 49 km from this site.

ReferenceYearIncidentFrom the siteSeverity
EIR-09112017Worker dies after fall from turbine at Whitelee windfarm near Glasgow49 kmMajor
EIR-11572026Fire destroys turbine at Whitelee windfarm near Glasgow54 kmSignificant
EIR-10252018Worker dies after becoming stranded at Afton wind farm58 kmMajor
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••

The first 3 rows as the pack shows them. The other 46 are in the pack, each with its distance, sources and the fire service guidance it bears on.

The map

Summary for this site

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

Paragraphs for the planning statement

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

In the full pack
Technology
Onshore wind
Capacity
25.8 MW
Capacity figure from
Renewable Energy Planning Database (UK government)
Status
Awaiting Construction (Planning Permission Granted)
Operator or applicant
EDF Energy Renewables
Location
Camilty Plantation Harburn West Calder, West Lothian, EH55 8RH, United Kingdom
Planning authority
West Lothian
Planning application
0320/FUL/21
Turbines
6, 149.9 m to tip

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

The planning application page for 0320/FUL/21, with what the planning evidence pack adds for this site.

Every application in West Lothian · Alerts for applications and incidents near here

  • 13 April 2021 Planning application submitted
  • 5 October 2021 Planning permission granted
  • 5 October 2026 Planning permission expired

None found. The register holds no published incident that names Camilty Plantation - Wind Farm. If you know of one, report it (confidential reports are anonymised).

Has Camilty Plantation - Wind Farm had a fire or other incident?
None is on the register as of 21 November 2026. The register holds no published incident that names Camilty Plantation - Wind Farm; it holds 63 incidents at wind farms in the United Kingdom.
What is the status of Camilty Plantation - Wind Farm?
Awaiting Construction, in the Renewable Energy Planning Database (UK government), where it last changed on 25 March 2022.
Where is Camilty Plantation - Wind Farm?
9.5 km south of Livingston, West Lothian, United Kingdom (postcode EH55 8RH).

Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).