Onshore wind · United Kingdom

Cairnandrew

Operator Inicio Fresco

Application Refused6 MWData checked 16 November 2026Source record dated 31 March 2020

Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.

Cairnandrew is a 6 MW wind farm 11 km north of Turriff, Aberdeenshire, United Kingdom. Its planning application (APP/2019/2280) went to Aberdeenshire on 30 October 2019 and was refused on 2 December 2019. Its status in the Renewable Energy Planning Database (UK government) is application refused. There are 20 other energy sites within 10 km, 14 of them wind farms. The register holds no incident at this site. It holds 63 incidents at wind farms in the United Kingdom, and 362 worldwide.

218 energy sites within 40 km for Cairnandrew

Members see the sites and incidents around this one, and every record behind them.

Technology
Onshore wind
Capacity
6 MW
Capacity figure from
Renewable Energy Planning Database (UK government)
Status
Application Refused (Planning Permission Refused)
Operator or applicant
Inicio Fresco
Location
Cairnandrew, Longmanhill, Banff, Grampian, Aberdeenshire, AB45 3SR, United Kingdom
Planning authority
Aberdeenshire
Planning application
APP/2019/2280
Turbines
2, 150 m to tip

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

The planning application page for APP/2019/2280, with what the planning evidence pack adds for this site.

Every application in Aberdeenshire · Alerts for applications and incidents near here

  • 30 October 2019 Planning application submitted
  • 2 December 2019 Planning permission refused

None found. The register holds no published incident that names Cairnandrew. If you know of one, report it (confidential reports are anonymised).

Own, insure or lend to this site or others like it? A portfolio safety record checks every site in a list against the register, free; the paid records add the site, operator, cause, downtime and loss behind each incident.

Has Cairnandrew had a fire or other incident?
None is on the register as of 21 November 2026. The register holds no published incident that names Cairnandrew; it holds 63 incidents at wind farms in the United Kingdom.
What is the status of Cairnandrew?
Application Refused, in the Renewable Energy Planning Database (UK government), where it last changed on 31 March 2020.
Where is Cairnandrew?
11 km north of Turriff, Aberdeenshire, United Kingdom (postcode AB45 3SR).

Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).