Pivot Power Bustleholm (Bustleholme Substation)
Operator Pivot Power · Owner Pivoted Power LLP
Operational49.9 MWData checked 16 November 2026Source record dated 20 October 2023
Watch this siteIts outage notices and incidents, what it earns and where it ranks, in your workspace and by email. 7 days free, no card.
Pivot Power Bustleholm (Bustleholme Substation) is a 49.9 MW battery storage site 4 km south-east of Walsall, West Midlands, United Kingdom. Its planning application (DC/20/64437) went to Sandwell on 6 July 2020 and was granted on 1 February 2021. It has been operating since 20 October 2023. Its status in the Renewable Energy Planning Database (UK government) is operational. There are 115 other energy sites within 10 km, 33 of them battery storage sites (hybrid battery and solar sites included). The register holds no incident at this site. It holds 14 incidents at battery storage sites (hybrid battery and solar sites included) in the United Kingdom, and 199 worldwide.
Get an email when Pivot Power Bustleholm (Bustleholme Substation) changes
Free. An email when its status changes: a planning decision, building starting, going live or closing. And each Monday, battery storage incidents in the United Kingdom. No account needed; unsubscribe in one click.
Confirm your email and every battery storage incident on the register arrives at once as a spreadsheet (CSV), free.
Get a free sample brief Three complete verified records and the incidents-per-GW table, by email within a minute.
We will also email you about the register's paid records and plans, at most once a week and three times in all. You can stop these at any time. By signing up you agree to the privacy policy.
Members see the sites and incidents around this one, and every record behind them.
What this site did, from settlement data
Full revenue and market view The pounds behind each bar, any period back to 2021, where it ranks against every site like it, who trades it, and a side-by-side with any other site.
A day out costs this site about £2,571 at its earnings over the last 25 settled days (response and reserve auctions). A figure from the market, not a claim: what the site earned, averaged, is what a day out forgoes.
Contains BMRS data © Elexon Limited copyright and database right (datasets B1610 and MID, the interim settlement run). Read each morning; a settled figure can be revised in later runs.
The company behind this site
PIVOT POWER LIMITED (12032042), active, since 2019. No outstanding charges on the register. Members see the charges register: each charge, when it was created and the lender it is in favour of.
Source: Companies House, matched by the operator's name. If this is the wrong company, tell the editor.
The site
- Technology
- Battery storage (Stand-alone Storage)
- Capacity
- 49.9 MW
- Capacity figure from
- Renewable Energy Planning Database (UK government)
- Status
- Operational
- Operator or applicant
- Pivot Power
- Owner
- Pivoted Power LLP
- Location
- Western Power Distribution Bus, Woodruff Way, Walsall, West Midlands, West Midlands, WS5 4RA, United Kingdom
- Planning authority
- Sandwell
- Planning application
- DC/20/64437
- First operating
- 2023
View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.
The planning application page for DC/20/64437, with what the planning evidence pack adds for this site.
Every application in Sandwell · Alerts for applications and incidents near here
Timeline
- 6 July 2020 Planning application submitted
- 1 February 2021 Planning permission granted
- 20 October 2023 Operational
Incidents on the register at this site
None found. The register holds no published incident that names Pivot Power Bustleholm (Bustleholme Substation). If you know of one, report it (confidential reports are anonymised).
Own, insure or lend to this site or others like it? A portfolio safety record checks every site in a list against the register, free; the paid records add the site, operator, cause, downtime and loss behind each incident.
Questions
- Has Pivot Power Bustleholm (Bustleholme Substation) had a fire or other incident?
- None is on the register as of 21 November 2026. The register holds no published incident that names Pivot Power Bustleholm (Bustleholme Substation); it holds 14 incidents at battery storage sites (hybrid battery and solar sites included) in the United Kingdom.
- What is the status of Pivot Power Bustleholm (Bustleholme Substation)?
- Operational, in the Renewable Energy Planning Database (UK government), where it last changed on 20 October 2023.
- Where is Pivot Power Bustleholm (Bustleholme Substation)?
- 4 km south-east of Walsall, West Midlands, United Kingdom (postcode WS5 4RA).
Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).