Solar · United Kingdom
Bunkers Hill
Operator Private Developer
Revised6.2 MWData checked 16 November 2026Source record dated 28 July 2017
Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.
Bunkers Hill is a 6.2 MW solar farm 4 km south-east of Hayle, Cornwall, United Kingdom. Its planning application (PA13/08286) went to Cornwall on 11 September 2013 and was refused on appeal on 6 July 2017. Its status in the Renewable Energy Planning Database (UK government) is revised. There are 19 other energy sites within 10 km, 14 of them solar farms (hybrid battery and solar sites included). The register holds no incident at this site. It holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom, and 480 worldwide.
Get an email when Bunkers Hill changes
Free. An email when its status changes: a planning decision, building starting, going live or closing. And each Monday, solar PV incidents in the United Kingdom. No account needed; unsubscribe in one click.
Confirm your email and every solar incident on the register arrives at once as a spreadsheet (CSV), free.
Get a free sample brief Three complete verified records and the incidents-per-GW table, by email within a minute.
We will also email you about the register's paid records and plans, at most once a week and three times in all. You can stop these at any time. By signing up you agree to the privacy policy.
The company behind this site
PRIVATE DEVELOPER NETWORK LIMITED (09386318), dissolved, since 2015. No outstanding charges on the register. Members see the charges register: each charge, when it was created and the lender it is in favour of.
Source: Companies House, matched by the operator's name. If this is the wrong company, tell the editor.
Preparing, reviewing or responding to a planning application for a site like this? The planning evidence pack for Bunkers Hill sets out every comparable incident for this project, with sources. £295, by email in minutes; the order form arrives filled in from this record.
Get the evidence pack for this site, £295 See a sample pack (PDF)
Preview of the planning evidence pack for this site
The pack for this site lists 104 comparable solar incidents in the United Kingdom, nearest first. The nearest is EIR-1543, Fire damages roof space and solar panels on bungalow in Crowan, 6.3 km from this site.
| Reference | Year | Incident | From the site | Severity |
|---|---|---|---|---|
| EIR-1543 | 2017 | Fire damages roof space and solar panels on bungalow in Crowan | 6.3 km | Significant |
| EIR-1540 | 2018 | Fire in solar panel on house roof in Flushing | 22 km | Minor |
| EIR-0474 | 2025 | Solar panel fire tackled on rooftop near Newquay beach | 36 km | Minor |
| •••••••• | •••• | •••••••••••••••••••••••••••••• | •••• | •••••• |
| •••••••• | •••• | •••••••••••••••••••••••••••••• | •••• | •••••• |
| •••••••• | •••• | •••••••••••••••••••••••••••••• | •••• | •••••• |
| •••••••• | •••• | •••••••••••••••••••••••••••••• | •••• | •••••• |
| •••••••• | •••• | •••••••••••••••••••••••••••••• | •••• | •••••• |
The first 3 rows as the pack shows them. The other 101 are in the pack, each with its distance, sources and the fire service guidance it bears on.
The map
Summary for this site
This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.
Paragraphs for the planning statement
This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.
In the full packThe site
- Technology
- Solar
- Capacity
- 6.2 MW
- Capacity figure from
- Renewable Energy Planning Database (UK government)
- Status
- Revised
- Operator or applicant
- Private Developer
- Location
- Land At Bunkers Hill Pilgrims Way St Erth Hayle, Cornwall, TR27 6ER, United Kingdom
- Planning authority
- Cornwall
- Planning application
- PA13/08286
- Appeal reference
- APP/D0840/W/15/3140774
View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.
The planning application page for PA13/08286, with what the planning evidence pack adds for this site.
Every application in Cornwall · Alerts for applications and incidents near here
Timeline
- 11 September 2013 Planning application submitted
- 20 December 2013 Planning permission refused
- 8 February 2016 Appeal lodged
- 6 July 2017 Appeal refused
Incidents on the register at this site
None found. The register holds no published incident that names Bunkers Hill. If you know of one, report it (confidential reports are anonymised).
Questions
- Has Bunkers Hill had a fire or other incident?
- None is on the register as of 21 November 2026. The register holds no published incident that names Bunkers Hill; it holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom.
- What is the status of Bunkers Hill?
- Revised, in the Renewable Energy Planning Database (UK government), where it last changed on 28 July 2017.
- Where is Bunkers Hill?
- 4 km south-east of Hayle, Cornwall, United Kingdom (postcode TR27 6ER).
Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).