Solar · United Kingdom

Building One, Wyndyke Furlong - Solar Panels

Operator Gigaclear Plc

Awaiting Construction0.2 MWData checked 16 November 2026Source record dated 2 September 2026

Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.

Building One, Wyndyke Furlong - Solar Panels is a 0.2 MW solar farm in Abingdon, Oxfordshire, United Kingdom. Its planning application (P26/V0496/N8A) went to Oxford on 25 February 2026 and was granted on 8 April 2026. Its status in the Renewable Energy Planning Database (UK government) is awaiting construction. There are 61 other energy sites within 10 km, 38 of them solar farms (hybrid battery and solar sites included). The register holds no incident at this site. It holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom, and 480 worldwide.

Preparing, reviewing or responding to a planning application for a site like this? The planning evidence pack for Building One, Wyndyke Furlong - Solar Panels sets out every comparable incident for this project, with sources. £295, by email in minutes; the order form arrives filled in from this record.

Get the evidence pack for this site, £295 See a sample pack (PDF)

The pack for this site lists 104 comparable solar incidents in the United Kingdom, nearest first. The nearest is EIR-1519, Solar panels involved in outbuilding roof fire in Bourne End, 42 km from this site.

ReferenceYearIncidentFrom the siteSeverity
EIR-15192025Solar panels involved in outbuilding roof fire in Bourne End42 kmMinor
EIR-00582025Fire in two battery containers at Cirencester Hybrid Solar Farm, Gloucestershire44 kmSignificant
EIR-12732022Solar panels believed to have started roof fire at house in Old Basing48 kmMinor
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••

The first 3 rows as the pack shows them. The other 101 are in the pack, each with its distance, sources and the fire service guidance it bears on.

The map

Summary for this site

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

Paragraphs for the planning statement

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

In the full pack
Technology
Solar
Capacity
0.2 MW
Capacity figure from
Renewable Energy Planning Database (UK government)
Status
Awaiting Construction (Planning Permission Granted)
Operator or applicant
Gigaclear Plc
Location
Building One Wyndyke Furlong, Oxfordshire, OX14 1UQ, United Kingdom
Planning authority
Oxford
Planning application
P26/V0496/N8A

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

The planning application page for P26/V0496/N8A, with what the planning evidence pack adds for this site.

Every application in Oxford · Alerts for applications and incidents near here

Status changed from Application Submitted to Awaiting Construction on 16 November 2026.

  • 25 February 2026 Planning application submitted
  • 8 April 2026 Planning permission granted

None found. The register holds no published incident that names Building One, Wyndyke Furlong - Solar Panels. If you know of one, report it (confidential reports are anonymised).

Has Building One, Wyndyke Furlong - Solar Panels had a fire or other incident?
None is on the register as of 21 November 2026. The register holds no published incident that names Building One, Wyndyke Furlong - Solar Panels; it holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom.
What is the status of Building One, Wyndyke Furlong - Solar Panels?
Awaiting Construction, in the Renewable Energy Planning Database (UK government), where it last changed on 16 November 2026.
Where is Building One, Wyndyke Furlong - Solar Panels?
In Abingdon, Oxfordshire, United Kingdom (postcode OX14 1UQ).

Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).