Solar · United Kingdom

Bryn-Y-Plentyn Farm

Operator CR and GM Woollam

Planning Permission Expired0.5 MWData checked 16 November 2026Source record dated 20 November 2019

Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.

Bryn-Y-Plentyn Farm is a 0.5 MW solar farm 3.8 km east of Oswestry, Shropshire, United Kingdom. Its planning application (18/05499/FUL) went to Shropshire on 28 November 2018 and was granted on 20 February 2019. Its status in the Renewable Energy Planning Database (UK government) is planning permission expired. There are 29 other energy sites within 10 km, 24 of them solar farms (hybrid battery and solar sites included). The register holds no incident at this site. It holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom, and 480 worldwide.

189 energy sites within 40 km for Bryn-Y-Plentyn Farm

Members see the sites and incidents around this one, and every record behind them.

Technology
Solar
Capacity
0.5 MW
Capacity figure from
Renewable Energy Planning Database (UK government)
Status
Planning Permission Expired
Operator or applicant
CR and GM Woollam
Location
Bryn-Y-Plentyn Farm, Bryn-Y-Plentyn, Middleton, Oswestry, Shropshire, Shropshire, SY11 4LP, United Kingdom
Planning authority
Shropshire
Planning application
18/05499/FUL

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

The planning application page for 18/05499/FUL, with what the planning evidence pack adds for this site.

Every application in Shropshire · Alerts for applications and incidents near here

  • 28 November 2018 Planning application submitted
  • 20 February 2019 Planning permission granted
  • 22 October 2022 Planning permission expired

None found. The register holds no published incident that names Bryn-Y-Plentyn Farm. If you know of one, report it (confidential reports are anonymised).

Own, insure or lend to this site or others like it? A portfolio safety record checks every site in a list against the register, free; the paid records add the site, operator, cause, downtime and loss behind each incident.

Has Bryn-Y-Plentyn Farm had a fire or other incident?
None is on the register as of 21 November 2026. The register holds no published incident that names Bryn-Y-Plentyn Farm; it holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom.
What is the status of Bryn-Y-Plentyn Farm?
Planning Permission Expired, in the Renewable Energy Planning Database (UK government), where it last changed on 20 November 2019.
Where is Bryn-Y-Plentyn Farm?
3.8 km east of Oswestry, Shropshire, United Kingdom (postcode SY11 4LP).

Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).