Bryn Blaen Wind Farm is a 13.8 MW wind farm 23 km south-west of Newtown, Powys, United Kingdom. Its planning application (P/2014/1102) went to Powys on 4 December 2014 and was granted on appeal on 23 August 2016. It has been operating since 1 January 2019. Its status in the Renewable Energy Planning Database (UK government) is operational. There are 10 other energy sites within 10 km, 8 of them wind farms. The register holds no incident at this site. It holds 63 incidents at wind farms in the United Kingdom, and 362 worldwide.
Get an email when Bryn Blaen Wind Farm changes
Free. An email when its status changes: a planning decision, building starting, going live or closing. And each Monday, onshore wind incidents in the United Kingdom. No account needed; unsubscribe in one click.
Confirm your email and every wind turbine incident on the register arrives at once as a spreadsheet (CSV), free.
Get a free sample brief Three complete verified records and the incidents-per-GW table, by email within a minute.
We will also email you about the register's paid records and plans, at most once a week and three times in all. You can stop these at any time. By signing up you agree to the privacy policy.
Members see the sites and incidents around this one, and every record behind them.
The site
- Technology
- Onshore wind
- Capacity
- 13.8 MW
- Capacity figure from
- Renewable Energy Planning Database (UK government)
- Status
- Operational
- Operator or applicant
- Njord Energy
- Location
- land north of the village of Llangurig in Powys, Powys, SY18 6SL, United Kingdom
- Planning authority
- Powys
- Planning application
- P/2014/1102
- Appeal reference
- APP/T6850/A/15/3133966
- First operating
- 2019
- Turbines
- 6, 100 m to tip
View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.
The planning application page for P/2014/1102, with what the planning evidence pack adds for this site.
Every application in Powys · Alerts for applications and incidents near here
Timeline
- 4 December 2014 Planning application submitted
- 26 November 2015 Appeal lodged
- 23 August 2016 Planning permission granted
- 23 August 2016 Appeal granted
- 15 June 2017 Construction started
- 1 January 2019 Operational
Incidents on the register at this site
None found. The register holds no published incident that names Bryn Blaen Wind Farm. If you know of one, report it (confidential reports are anonymised).
Own, insure or lend to this site or others like it? A portfolio safety record checks every site in a list against the register, free; the paid records add the site, operator, cause, downtime and loss behind each incident.
Questions
- Has Bryn Blaen Wind Farm had a fire or other incident?
- None is on the register as of 21 November 2026. The register holds no published incident that names Bryn Blaen Wind Farm; it holds 63 incidents at wind farms in the United Kingdom.
- What is the status of Bryn Blaen Wind Farm?
- Operational, in the Renewable Energy Planning Database (UK government), where it last changed on 15 February 2024.
- Where is Bryn Blaen Wind Farm?
- 23 km south-west of Newtown, Powys, United Kingdom (postcode SY18 6SL).
Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).