Onshore wind · United Kingdom
Brockaghboy Wind Farm (Further Extension)
Operator Brockaghboy Windfarm
Awaiting Construction10 MWData checked 16 November 2026Source record dated 15 September 2020
Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.
Brockaghboy Wind Farm (Further Extension) is a 10 MW wind farm 20 km south-east of Limavady, Co. Derry / Londonderry, United Kingdom. Its planning application (LA09/2019/1386/F) went to Mid Ulster on 14 October 2019 and was granted on 25 August 2020. Its status in the Renewable Energy Planning Database (UK government) is awaiting construction. There are 12 other energy sites within 10 km. The register holds no incident at this site. It holds 63 incidents at wind farms in the United Kingdom, and 362 worldwide.
Get an email when Brockaghboy Wind Farm (Further Extension) changes
Free. An email when its status changes: a planning decision, building starting, going live or closing. And each Monday, onshore wind incidents in the United Kingdom. No account needed; unsubscribe in one click.
Confirm your email and every wind turbine incident on the register arrives at once as a spreadsheet (CSV), free.
Get a free sample brief Three complete verified records and the incidents-per-GW table, by email within a minute.
We will also email you about the register's paid records and plans, at most once a week and three times in all. You can stop these at any time. By signing up you agree to the privacy policy.
Preparing, reviewing or responding to a planning application for a site like this? The planning evidence pack for Brockaghboy Wind Farm (Further Extension) sets out every comparable incident for this project, with sources. £295, by email in minutes; the order form arrives filled in from this record.
Get the evidence pack for this site, £295 See a sample pack (PDF)
Preview of the planning evidence pack for this site
The pack for this site lists 49 comparable onshore wind incidents in the United Kingdom, nearest first. The nearest is EIR-1038, Wind turbine reported to have collapsed in Northern Ireland during severe storm, 41 km from this site.
| Reference | Year | Incident | From the site | Severity |
|---|---|---|---|---|
| EIR-1038 | 2017 | Wind turbine reported to have collapsed in Northern Ireland during severe storm | 41 km | Significant |
| EIR-0422 | 2025 | Wind turbine fire prompts fire service response in Fermanagh | 79 km | Minor |
| EIR-1134 | 2017 | Wind turbine tower collapses at Kilgallioch Wind Farm, Ayrshire | 125 km | Significant |
| •••••••• | •••• | •••••••••••••••••••••••••••••• | •••• | •••••• |
| •••••••• | •••• | •••••••••••••••••••••••••••••• | •••• | •••••• |
| •••••••• | •••• | •••••••••••••••••••••••••••••• | •••• | •••••• |
| •••••••• | •••• | •••••••••••••••••••••••••••••• | •••• | •••••• |
| •••••••• | •••• | •••••••••••••••••••••••••••••• | •••• | •••••• |
The first 3 rows as the pack shows them. The other 46 are in the pack, each with its distance, sources and the fire service guidance it bears on.
The map
Summary for this site
This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.
Paragraphs for the planning statement
This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.
In the full packThe site
- Technology
- Onshore wind
- Capacity
- 10 MW
- Capacity figure from
- Renewable Energy Planning Database (UK government)
- Status
- Awaiting Construction (Planning Permission Granted)
- Operator or applicant
- Brockaghboy Windfarm
- Location
- Brockaghboy Wind Farm, 10A Drumbane Road, Garvagh, south east of Dowlin's Bridge, Coleraine, Co Londonderry, Co. Derry / Londonderry, BT51 5DR, United Kingdom
- Planning authority
- Mid Ulster
- Planning application
- LA09/2019/1386/F
- Turbines
- 4, 125 m to tip
View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.
The planning application page for LA09/2019/1386/F, with what the planning evidence pack adds for this site.
Every application in Mid Ulster · Alerts for applications and incidents near here
Timeline
- 14 October 2019 Planning application submitted
- 25 August 2020 Planning permission granted
- 14 September 2025 Planning permission expired
Incidents on the register at this site
None found. The register holds no published incident that names Brockaghboy Wind Farm (Further Extension). If you know of one, report it (confidential reports are anonymised).
Questions
- Has Brockaghboy Wind Farm (Further Extension) had a fire or other incident?
- None is on the register as of 21 November 2026. The register holds no published incident that names Brockaghboy Wind Farm (Further Extension); it holds 63 incidents at wind farms in the United Kingdom.
- What is the status of Brockaghboy Wind Farm (Further Extension)?
- Awaiting Construction, in the Renewable Energy Planning Database (UK government), where it last changed on 15 September 2020.
- Where is Brockaghboy Wind Farm (Further Extension)?
- 20 km south-east of Limavady, Co. Derry / Londonderry, United Kingdom (postcode BT51 5DR).
Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).