← Back to West Sussex
Planning pack for this site, £295Other options

Solar · United Kingdom

Broadlands Business Campus, Langhurst Wood Road - Solar Panels Phase 3

Operator Schroder Corporate Services Limited

Awaiting Construction0.5 MWData checked 16 November 2026Source record dated 12 May 2023

Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.

Broadlands Business Campus, Langhurst Wood Road - Solar Panels Phase 3 is a 0.5 MW solar farm 5 km north of Horsham, West Sussex, United Kingdom. Its planning application (DC/22/2374) went to Horsham on 23 December 2022 and was granted on 5 May 2023. Its status in the Renewable Energy Planning Database (UK government) is awaiting construction. There are 13 other energy sites within 10 km, 12 of them solar farms (hybrid battery and solar sites included). The register holds no incident at this site. It holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom, and 480 worldwide.

Preparing, reviewing or responding to a planning application for a site like this? The planning evidence pack for Broadlands Business Campus, Langhurst Wood Road - Solar Panels Phase 3 sets out every comparable incident for this project, with sources. £295, by email in minutes; the order form arrives filled in from this record.

Get the evidence pack for this site, £295 See a sample pack (PDF)

The pack for this site lists 104 comparable solar incidents in the United Kingdom, nearest first. The nearest is EIR-2447, Inverter fire on rooftop solar equipment at Sainsbury's store in Sutton, 30 km from this site.

ReferenceYearIncidentFrom the siteSeverity
EIR-24472024Inverter fire on rooftop solar equipment at Sainsbury's store in Sutton30 kmMinor
EIR-15222026Fire damages roof with one solar panel in The Charltons31 kmMinor
EIR-15122024Solar panels involved in fire at school in Carshalton31 kmMinor
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••

The first 3 rows as the pack shows them. The other 101 are in the pack, each with its distance, sources and the fire service guidance it bears on.

The map

Summary for this site

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

Paragraphs for the planning statement

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

In the full pack
Technology
Solar
Capacity
0.5 MW
Capacity figure from
Renewable Energy Planning Database (UK government)
Status
Awaiting Construction (Planning Permission Granted)
Operator or applicant
Schroder Corporate Services Limited
Location
Broadlands Business Campus Langhurst Wood Road, West Sussex, RH12 4QP, United Kingdom
Planning authority
Horsham
Planning application
DC/22/2374

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

The planning application page for DC/22/2374, with what the planning evidence pack adds for this site.

Every application in Horsham · Alerts for applications and incidents near here

  • 23 December 2022 Planning application submitted
  • 5 May 2023 Planning permission granted
  • 5 May 2026 Planning permission expired

None found. The register holds no published incident that names Broadlands Business Campus, Langhurst Wood Road - Solar Panels Phase 3. If you know of one, report it (confidential reports are anonymised).

Has Broadlands Business Campus, Langhurst Wood Road - Solar Panels Phase 3 had a fire or other incident?
None is on the register as of 21 November 2026. The register holds no published incident that names Broadlands Business Campus, Langhurst Wood Road - Solar Panels Phase 3; it holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom.
What is the status of Broadlands Business Campus, Langhurst Wood Road - Solar Panels Phase 3?
Awaiting Construction, in the Renewable Energy Planning Database (UK government), where it last changed on 12 May 2023.
Where is Broadlands Business Campus, Langhurst Wood Road - Solar Panels Phase 3?
5 km north of Horsham, West Sussex, United Kingdom (postcode RH12 4QP).

Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).