← Back to Kent
Planning pack for this site, £295Other options

Solar · United Kingdom

Britton Court Farm, Hackington Road - Solar Farm

Operator Renewable Connections Developments Limited · Owner Rivington Energy Limited

Awaiting Construction38 MWData checked 16 November 2026Source record dated 28 July 2025

Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.

Britton Court Farm, Hackington Road - Solar Farm is a 38 MW solar farm 3.7 km west of Sturry, Kent, United Kingdom. Its planning application (CA/24/02283) went to Canterbury on 20 September 2024 and was granted on 4 July 2025. Its status in the Renewable Energy Planning Database (UK government) is awaiting construction. There are 38 other energy sites within 10 km, 28 of them solar farms (hybrid battery and solar sites included). The register holds no incident at this site. It holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom, and 480 worldwide.

RENEWABLE CONNECTIONS DEVELOPMENTS LIMITED (12351905), active, since 2019. No outstanding charges on the register. Members see the charges register: each charge, when it was created and the lender it is in favour of.

Source: Companies House, matched by the operator's name. If this is the wrong company, tell the editor.

Preparing, reviewing or responding to a planning application for a site like this? The planning evidence pack for Britton Court Farm, Hackington Road - Solar Farm sets out every comparable incident for this project, with sources. £295, by email in minutes; the order form arrives filled in from this record.

Get the evidence pack for this site, £295 See a sample pack (PDF)

The pack for this site lists 104 comparable solar incidents in the United Kingdom, nearest first. The nearest is EIR-2069, Solar panel fire spreads through roof of new flats at Ebbsfleet, 19 km from this site.

ReferenceYearIncidentFrom the siteSeverity
EIR-20692021Solar panel fire spreads through roof of new flats at Ebbsfleet19 kmSignificant
EIR-15372021Garage fire from overheated solar batteries in South Woodham Ferrers48 kmMinor
EIR-15302023Electrical fault causes solar panel fire in Wickford house50 kmMinor
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••

The first 3 rows as the pack shows them. The other 101 are in the pack, each with its distance, sources and the fire service guidance it bears on.

The map

Summary for this site

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

Paragraphs for the planning statement

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

In the full pack
Technology
Solar
Capacity
38 MW
Capacity figure from
Renewable Energy Planning Database (UK government)
Status
Awaiting Construction (Planning Permission Granted)
Operator or applicant
Renewable Connections Developments Limited
Owner
Rivington Energy Limited
Location
Britton Court Farm, Hackington Road, Tyler Hill, Canterbury, Kent, CT2 9NG, United Kingdom
Planning authority
Canterbury
Planning application
CA/24/02283

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

The planning application page for CA/24/02283, with what the planning evidence pack adds for this site.

Every application in Canterbury · Alerts for applications and incidents near here

  • 20 September 2024 Planning application submitted
  • 4 July 2025 Planning permission granted
  • 4 July 2028 Planning permission runs out

None found. The register holds no published incident that names Britton Court Farm, Hackington Road - Solar Farm. If you know of one, report it (confidential reports are anonymised).

Has Britton Court Farm, Hackington Road - Solar Farm had a fire or other incident?
None is on the register as of 21 November 2026. The register holds no published incident that names Britton Court Farm, Hackington Road - Solar Farm; it holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom.
What is the status of Britton Court Farm, Hackington Road - Solar Farm?
Awaiting Construction, in the Renewable Energy Planning Database (UK government), where it last changed on 28 July 2025.
Where is Britton Court Farm, Hackington Road - Solar Farm?
3.7 km west of Sturry, Kent, United Kingdom (postcode CT2 9NG).