Battery storage · Germany
Brickeln 2.1 Speicher
Operator ENERPARC Solar Invest 230 TU 72 GmbH & Co. KG
Planned3 MWData checked 10 November 2026
Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.
Brickeln 2.1 Speicher is a 3 MW battery storage site 14 km south-east of Meldorf, Brickeln, Dithmarschen, Schleswig-Holstein, Germany. It first operated in 2026. Its status in the Marktstammdatenregister (Bundesnetzagentur, Germany) is planned. There are 66 other energy sites within 10 km, one of them a battery storage site. The register holds no incident at this site. It holds 17 incidents at battery storage sites in Germany, and 196 worldwide.
Get an email when Brickeln 2.1 Speicher changes
Free. An email when its status changes: a planning decision, building starting, going live or closing. And each Monday, battery storage incidents in Germany. No account needed; unsubscribe in one click.
Confirm your email and every battery storage incident on the register arrives at once as a spreadsheet (CSV), free.
Get a free sample brief Three complete verified records and the incidents-per-GW table, by email within a minute.
We will also email you about the register's paid records and plans, at most once a week and three times in all. You can stop these at any time. By signing up you agree to the privacy policy.
Preparing, reviewing or responding to a planning application for a site like this? The planning evidence pack for Brickeln 2.1 Speicher sets out every comparable incident for this project, with sources. £295, by email in minutes; the order form arrives filled in from this record.
Get the evidence pack for this site, £295 See a sample pack (PDF)
The site
- Technology
- Battery storage (Usable capacity 11 MWh, Lithium-Batterie)
- Capacity
- 3 MW
- Capacity figure from
- Marktstammdatenregister (Bundesnetzagentur, Germany)
- Status
- Planned (In planning)
- Operator
- ENERPARC Solar Invest 230 TU 72 GmbH & Co. KG
- Location
- Brickeln, Dithmarschen, Schleswig-Holstein, 25712, Germany
- First operating
- 2026
View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.
Incidents on the register at this site
None found. The register holds no published incident that names Brickeln 2.1 Speicher. If you know of one, report it (confidential reports are anonymised).
Questions
- Has Brickeln 2.1 Speicher had a fire or other incident?
- None is on the register as of 11 November 2026. The register holds no published incident that names Brickeln 2.1 Speicher; it holds 17 incidents at battery storage sites in Germany.
- What is the status of Brickeln 2.1 Speicher?
- Planned, in the Marktstammdatenregister (Bundesnetzagentur, Germany).
- Where is Brickeln 2.1 Speicher?
- 14 km south-east of Meldorf, Brickeln, Dithmarschen, Schleswig-Holstein, Germany (postcode 25712).
Source: Marktstammdatenregister, Bundesnetzagentur, Datenlizenz Deutschland, Namensnennung, Version 2.0 (www.govdata.de/dl-de/by-2-0). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).