Brazoria County Solar Project (Danciger)

Operator Brazoria County Solar Project, LLC

Operational200 MWData checked 12 November 2026

Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.

Brazoria County Solar Project (Danciger) is a 200 MW solar farm 30 km north-east of Bay City, Brazoria County, Texas, United States. It first operated in 2022. Its status in the U.S. Energy Information Administration, Form EIA-860M is operational. There are 4 other energy sites within 10 km, 2 of them solar farms (hybrid battery and solar sites included). The register holds no incident at this site. It holds 168 incidents at solar farms (hybrid battery and solar sites included) in the United States, and 480 worldwide.

59 energy sites within 40 km for Brazoria County Solar Project (Danciger)

Members see the sites and incidents around this one, and every record behind them.

Technology
Solar
Capacity
200 MW
Capacity figure from
U.S. Energy Information Administration, Form EIA-860M
Status
Operational
Operator
Brazoria County Solar Project, LLC
Owner
Brazoria County Solar Project, LLC
Location
Brazoria County, Texas, United States
First operating
2022
Balancing authority
ERCO

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

Alerts for applications and incidents near here

None found. The register holds no published incident that names Brazoria County Solar Project (Danciger). If you know of one, report it (confidential reports are anonymised).

Own, insure or lend to this site or others like it? A portfolio safety record checks every site in a list against the register, free; the paid records add the site, operator, cause, downtime and loss behind each incident.

Has Brazoria County Solar Project (Danciger) had a fire or other incident?
None is on the register as of 21 November 2026. The register holds no published incident that names Brazoria County Solar Project (Danciger); it holds 168 incidents at solar farms (hybrid battery and solar sites included) in the United States.
What is the status of Brazoria County Solar Project (Danciger)?
Operational, in the U.S. Energy Information Administration, Form EIA-860M.
Where is Brazoria County Solar Project (Danciger)?
30 km north-east of Bay City, Brazoria County, Texas, United States.

Source: U.S. Energy Information Administration, Form EIA-860M (Preliminary Monthly Electric Generator Inventory). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).