Battery storage · United Kingdom
Braston New Energy Limited 02
Operator BRASTON NEW ENERGY LIMITED · Owner Braston New Energy Limited
Awaiting Construction61.3 MWData checked 12 November 2026
Watch this siteIts outage notices and incidents, what it earns and where it ranks, in your workspace and by email. 7 days free, no card.
Braston New Energy Limited 02 is a 61.3 MW battery storage site 3.4 km south-east of Ayr, South Ayrshire, United Kingdom. Its status in the public dataset is awaiting construction. There are 12 other energy sites within 10 km, 5 of them battery storage sites (hybrid battery and solar sites included). The register holds no incident at this site. It holds 14 incidents at battery storage sites (hybrid battery and solar sites included) in the United Kingdom, and 199 worldwide.
Get an email when Braston New Energy Limited 02 changes
Free. An email when its status changes: a planning decision, building starting, going live or closing. And each Monday, battery storage incidents in the United Kingdom. No account needed; unsubscribe in one click.
Confirm your email and every battery storage incident on the register arrives at once as a spreadsheet (CSV), free.
Get a free sample brief Three complete verified records and the incidents-per-GW table, by email within a minute.
We will also email you about the register's paid records and plans, at most once a week and three times in all. You can stop these at any time. By signing up you agree to the privacy policy.
Preparing, reviewing or responding to a planning application for a site like this? The planning evidence pack for Braston New Energy Limited 02 sets out every comparable incident for this project, with sources. £295, by email in minutes; the order form arrives filled in from this record.
Get the evidence pack for this site, £295 See a sample pack (PDF)
Preview of the planning evidence pack for this site
The pack for this site lists 5 comparable battery incidents in the United Kingdom, grid-scale only, nearest first. The nearest is EIR-0638, Explosion and prolonged fire at Orsted battery storage site in Liverpool, 252 km from this site.
| Reference | Year | Incident | From the site | Severity |
|---|---|---|---|---|
| EIR-0638 | 2020 | Explosion and prolonged fire at Orsted battery storage site in Liverpool | 252 km | Major |
| EIR-0584 | 2026 | Fire in a battery container at Rufford Colliery BESS, Rainworth; owner attributes it to a short circuit in NMC cells | 343 km | Significant |
| EIR-0058 | 2025 | Fire in two battery containers at Cirencester Hybrid Solar Farm, Gloucestershire | 450 km | Significant |
| •••••••• | •••• | •••••••••••••••••••••••••••••• | •••• | •••••• |
| •••••••• | •••• | •••••••••••••••••••••••••••••• | •••• | •••••• |
The first 3 rows as the pack shows them. The other 2 are in the pack, each with its distance, sources and the fire service guidance it bears on.
The map
Summary for this site
This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.
Paragraphs for the planning statement
This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.
In the full packThe site
- Technology
- Battery storage (Battery)
- Capacity
- 61.3 MW (this record)
- Planning record
- 500 MW
- Capacity figure from
- Capacity Market register (EMR Delivery Body)
- Status
- Awaiting Construction (Capacity Market unit, delivery year 2029)
- Operator
- BRASTON NEW ENERGY LIMITED
- Owner
- Braston New Energy Limited
- Location
- South Ayrshire, KA6 6AA, United Kingdom
This record is a Capacity Market unit, and 61.3 MW is the figure entered in the auction. The planning record for this place, Braston New Energy / The Wallace Project, gives 500 MW. Braston New Energy / The Wallace Project
View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.
Incidents on the register at this site
None found. The register holds no published incident that names Braston New Energy Limited 02. If you know of one, report it (confidential reports are anonymised).
Questions
- Has Braston New Energy Limited 02 had a fire or other incident?
- None is on the register as of 21 November 2026. The register holds no published incident that names Braston New Energy Limited 02; it holds 14 incidents at battery storage sites (hybrid battery and solar sites included) in the United Kingdom.
- What is the status of Braston New Energy Limited 02?
- Awaiting Construction, in the public dataset.
- Where is Braston New Energy Limited 02?
- 3.4 km south-east of Ayr, South Ayrshire, United Kingdom (postcode KA6 6AA).
The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).