Braston New Energy / The Wallace Project

Operator ContourGlobal

Awaiting Construction500 MWData checked 16 November 2026Source record dated 28 July 2026

Watch this siteIts outage notices and incidents, what it earns and where it ranks, in your workspace and by email. 7 days free, no card.

Braston New Energy / The Wallace Project is a 500 MW battery storage site 3.3 km south-east of Ayr, United Kingdom. Its planning application (ECU00004995) went to Scottish Government (S36) on 3 April 2024 and was granted on 23 April 2025. Its status in the Renewable Energy Planning Database (UK government) is awaiting construction. There are 12 other energy sites within 10 km, 5 of them battery storage sites (hybrid battery and solar sites included). The register holds no incident at this site. It holds 14 incidents at battery storage sites (hybrid battery and solar sites included) in the United Kingdom, and 199 worldwide.

Preparing, reviewing or responding to a planning application for a site like this? The planning evidence pack for Braston New Energy / The Wallace Project sets out every comparable incident for this project, with sources. £295, by email in minutes; the order form arrives filled in from this record.

Get the evidence pack for this site, £295 See a sample pack (PDF)

The pack for this site lists 5 comparable battery incidents in the United Kingdom, grid-scale only, nearest first. The nearest is EIR-0638, Explosion and prolonged fire at Orsted battery storage site in Liverpool, 252 km from this site.

ReferenceYearIncidentFrom the siteSeverity
EIR-06382020Explosion and prolonged fire at Orsted battery storage site in Liverpool252 kmMajor
EIR-05842026Fire in a battery container at Rufford Colliery BESS, Rainworth; owner attributes it to a short circuit in NMC cells343 kmSignificant
EIR-00582025Fire in two battery containers at Cirencester Hybrid Solar Farm, Gloucestershire450 kmSignificant
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••

The first 3 rows as the pack shows them. The other 2 are in the pack, each with its distance, sources and the fire service guidance it bears on.

The map

Summary for this site

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

Paragraphs for the planning statement

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

In the full pack
Technology
Battery storage (Stand-alone Storage)
Capacity
500 MW
Capacity figure from
Renewable Energy Planning Database (UK government)
Status
Awaiting Construction (Planning Permission Granted)
Operator or applicant
ContourGlobal
Location
A77, Masonhill, Alloway, Ayrshire, KA7 3PF, United Kingdom
Planning authority
Scottish Government (S36)
Planning application
ECU00004995

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

The planning application page for ECU00004995, with what the planning evidence pack adds for this site.

Every application in Scottish Government (S36) · Alerts for applications and incidents near here

  • 23 April 2015 Planning permission expired
  • 3 April 2024 Planning application submitted
  • 23 April 2025 Planning permission granted

None found. The register holds no published incident that names Braston New Energy / The Wallace Project. If you know of one, report it (confidential reports are anonymised).

Has Braston New Energy / The Wallace Project had a fire or other incident?
None is on the register as of 21 November 2026. The register holds no published incident that names Braston New Energy / The Wallace Project; it holds 14 incidents at battery storage sites (hybrid battery and solar sites included) in the United Kingdom.
What is the status of Braston New Energy / The Wallace Project?
Awaiting Construction, in the Renewable Energy Planning Database (UK government), where it last changed on 28 July 2026.
Where is Braston New Energy / The Wallace Project?
3.3 km south-east of Ayr, United Kingdom (postcode KA7 3PF).

Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).