Solar · United Kingdom

Bracks Farm

Operator British Solar Renewables & BayWa r.e. UK Limited

Operational28 MWData checked 16 November 2026Source record dated 4 October 2023

Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.

Bracks Farm is a 28 MW solar farm on the edge of Soham, Cambridgeshire, United Kingdom. Its planning application (20/00522/FUM) went to East Cambridgeshire on 21 April 2020 and was granted on 12 October 2021. It has been operating since 4 October 2023. Its status in the Renewable Energy Planning Database (UK government) is operational. There are 35 other energy sites within 10 km, 21 of them solar farms (hybrid battery and solar sites included). The register holds no incident at this site. It holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom, and 480 worldwide.

The operator's 2 other sites and 293 energy sites within 40 km for Bracks Farm

Members see the sites and incidents around this one, and every record behind them.

Technology
Solar
Capacity
28 MW
Capacity figure from
Renewable Energy Planning Database (UK government)
Status
Operational
Operator or applicant
British Solar Renewables & BayWa r.e. UK Limited
Location
Bracks Farm, Wicken, Ely, Cambridgeshire, CB7, United Kingdom
Planning authority
East Cambridgeshire
Planning application
20/00522/FUM
First operating
2023

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

The planning application page for 20/00522/FUM, with what the planning evidence pack adds for this site.

Every application in East Cambridgeshire · Alerts for applications and incidents near here

  • 21 April 2020 Planning application submitted
  • 12 October 2021 Planning permission granted
  • 4 October 2023 Operational

None found. The register holds no published incident that names Bracks Farm. If you know of one, report it (confidential reports are anonymised).

Own, insure or lend to this site or others like it? A portfolio safety record checks every site in a list against the register, free; the paid records add the site, operator, cause, downtime and loss behind each incident.

Has Bracks Farm had a fire or other incident?
None is on the register as of 21 November 2026. The register holds no published incident that names Bracks Farm; it holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom.
What is the status of Bracks Farm?
Operational, in the Renewable Energy Planning Database (UK government), where it last changed on 4 October 2023.
Where is Bracks Farm?
On the edge of Soham, Cambridgeshire, United Kingdom (postcode CB7).

Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).