Solar · United Kingdom
Bowerhouse Farm
Operator KWTN Solar · Owner 5t Limited
Operational8.3 MWData checked 20 November 2026Source record dated 5 October 2015
Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.
Bowerhouse Farm is a 8.3 MW solar farm 5.5 km south-west of Yatton, Avon, United Kingdom. Its planning application (14/P/1666/F) went to North Somerset on 31 July 2014 and was granted on 30 October 2014. It has been operating since 29 March 2015. Its status in the Renewable Energy Planning Database (UK government) is operational. There are 49 other energy sites within 10 km, 31 of them solar farms (hybrid battery and solar sites included). The register holds no incident at this site. It holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom, and 480 worldwide.
Get an email when Bowerhouse Farm changes
Free. An email when its status changes: a planning decision, building starting, going live or closing. And each Monday, solar PV incidents in the United Kingdom. No account needed; unsubscribe in one click.
Confirm your email and every solar incident on the register arrives at once as a spreadsheet (CSV), free.
Get a free sample brief Three complete verified records and the incidents-per-GW table, by email within a minute.
We will also email you about the register's paid records and plans, at most once a week and three times in all. You can stop these at any time. By signing up you agree to the privacy policy.
Members see the sites and incidents around this one, and every record behind them.
The company behind this site
KWTN SOLAR LIMITED (07492876), active, since 2011. No outstanding charges on the register. Members see the charges register: each charge, when it was created and the lender it is in favour of.
Source: Companies House, matched by the operator's name. If this is the wrong company, tell the editor.
The site
- Technology
- Solar
- Capacity
- 8.3 MW
- Capacity figure from
- Renewable Energy Planning Database (UK government)
- Status
- Operational
- Operator or applicant
- KWTN Solar
- Owner
- 5t Limited
- Location
- Land at Bowerhouse East of Riverside Banwell, Avon, BS29 6EL, United Kingdom
- Planning authority
- North Somerset
- Planning application
- 14/P/1666/F
- First operating
- 2015
View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.
The planning application page for 14/P/1666/F, with what the planning evidence pack adds for this site.
Every application in North Somerset · Alerts for applications and incidents near here
Timeline
- 31 July 2014 Planning application submitted
- 30 October 2014 Planning permission granted
- 1 January 2015 Construction started
- 29 March 2015 Operational
Incidents on the register at this site
None found. The register holds no published incident that names Bowerhouse Farm. If you know of one, report it (confidential reports are anonymised).
Own, insure or lend to this site or others like it? A portfolio safety record checks every site in a list against the register, free; the paid records add the site, operator, cause, downtime and loss behind each incident.
Questions
- Has Bowerhouse Farm had a fire or other incident?
- None is on the register as of 21 November 2026. The register holds no published incident that names Bowerhouse Farm; it holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom.
- What is the status of Bowerhouse Farm?
- Operational, in the Renewable Energy Planning Database (UK government), where it last changed on 5 October 2015.
- Where is Bowerhouse Farm?
- 5.5 km south-west of Yatton, Avon, United Kingdom (postcode BS29 6EL).
Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).