← Back to Somerset

Solar · United Kingdom

Bournville Primary School, Selworthy Road - Solar Panels

Operator Solar Options for Schools Limited

Operational0.3 MWData checked 16 November 2026Source record dated 24 August 2026

Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.

Bournville Primary School, Selworthy Road - Solar Panels is a 0.3 MW solar farm on the edge of Weston-super-Mare, Somerset, United Kingdom. Its planning application (25/P/1860/SJA) went to North Somerset on 24 September 2025 and was granted on 17 December 2025. It has been operating since 1 April 2026. Its status in the Renewable Energy Planning Database (UK government) is operational. There are 33 other energy sites within 10 km, 20 of them solar farms (hybrid battery and solar sites included). The register holds no incident at this site. It holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom, and 480 worldwide.

The operator's 105 other sites and 522 energy sites within 40 km for Bournville Primary School, Selworthy Road - Solar Panels

Members see the sites and incidents around this one, and every record behind them.

SOLAR OPTIONS FOR SCHOOLS LIMITED (09812345), active, since 2015. No outstanding charges on the register. Members see the charges register: each charge, when it was created and the lender it is in favour of.

Source: Companies House, matched by the operator's name. If this is the wrong company, tell the editor.

Technology
Solar
Capacity
0.3 MW
Capacity figure from
Renewable Energy Planning Database (UK government)
Status
Operational
Operator or applicant
Solar Options for Schools Limited
Location
Bournville Primary, Selworthy Road, Weston-super-Mare, Somerset, BS23 3ST, United Kingdom
Planning authority
North Somerset
Planning application
25/P/1860/SJA
First operating
2026

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

The planning application page for 25/P/1860/SJA, with what the planning evidence pack adds for this site.

Every application in North Somerset · Alerts for applications and incidents near here

Status changed from Awaiting Construction to Operational on 16 November 2026.

  • 24 September 2025 Planning application submitted
  • 17 December 2025 Planning permission granted
  • 1 February 2026 Construction started
  • 1 April 2026 Operational

None found. The register holds no published incident that names Bournville Primary School, Selworthy Road - Solar Panels. If you know of one, report it (confidential reports are anonymised).

Own, insure or lend to this site or others like it? A portfolio safety record checks every site in a list against the register, free; the paid records add the site, operator, cause, downtime and loss behind each incident.

Has Bournville Primary School, Selworthy Road - Solar Panels had a fire or other incident?
None is on the register as of 21 November 2026. The register holds no published incident that names Bournville Primary School, Selworthy Road - Solar Panels; it holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom.
What is the status of Bournville Primary School, Selworthy Road - Solar Panels?
Operational, in the Renewable Energy Planning Database (UK government), where it last changed on 16 November 2026.
Where is Bournville Primary School, Selworthy Road - Solar Panels?
On the edge of Weston-super-Mare, Somerset, United Kingdom (postcode BS23 3ST).

Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).