Solar · United Kingdom

Borders General Hospital - Solar Photovoltaic Array

Operator NHS Borders Health Board

Awaiting Construction0.7 MWData checked 16 November 2026Source record dated 13 January 2025

Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.

Borders General Hospital - Solar Photovoltaic Array is a 0.7 MW solar farm 4.6 km south-east of Galashiels, Borders, United Kingdom. Its planning application (24/00821/FUL) went to Scottish Borders on 16 July 2024 and was granted on 6 December 2024. Its status in the Renewable Energy Planning Database (UK government) is awaiting construction. There are 5 other energy sites within 10 km, 4 of them solar farms (hybrid battery and solar sites included). The register holds no incident at this site. It holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom, and 480 worldwide.

Preparing, reviewing or responding to a planning application for a site like this? The planning evidence pack for Borders General Hospital - Solar Photovoltaic Array sets out every comparable incident for this project, with sources. £295, by email in minutes; the order form arrives filled in from this record.

Get the evidence pack for this site, £295 See a sample pack (PDF)

The pack for this site lists 104 comparable solar incidents in the United Kingdom, nearest first. The nearest is EIR-2016, Solar panel fire evacuates Hawick High School, 19 km from this site.

ReferenceYearIncidentFrom the siteSeverity
EIR-20162022Solar panel fire evacuates Hawick High School19 kmSignificant
EIR-12382019Leak from solar heating system at Carnegie Leisure Centre Dunfermline69 kmMinor
EIR-14992025Solar panels linked to fires at council buildings in Northumberland92 kmSignificant
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••

The first 3 rows as the pack shows them. The other 101 are in the pack, each with its distance, sources and the fire service guidance it bears on.

The map

Summary for this site

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

Paragraphs for the planning statement

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

In the full pack
Technology
Solar
Capacity
0.7 MW
Capacity figure from
Renewable Energy Planning Database (UK government)
Status
Awaiting Construction (Planning Permission Granted)
Operator or applicant
NHS Borders Health Board
Location
S/O Borders General Hospital, Melrose, Borders, TD6 9BS, United Kingdom
Planning authority
Scottish Borders
Planning application
24/00821/FUL

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

The planning application page for 24/00821/FUL, with what the planning evidence pack adds for this site.

Every application in Scottish Borders · Alerts for applications and incidents near here

  • 16 July 2024 Planning application submitted
  • 6 December 2024 Planning permission granted
  • 6 December 2027 Planning permission runs out

None found. The register holds no published incident that names Borders General Hospital - Solar Photovoltaic Array. If you know of one, report it (confidential reports are anonymised).

Has Borders General Hospital - Solar Photovoltaic Array had a fire or other incident?
None is on the register as of 21 November 2026. The register holds no published incident that names Borders General Hospital - Solar Photovoltaic Array; it holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom.
What is the status of Borders General Hospital - Solar Photovoltaic Array?
Awaiting Construction, in the Renewable Energy Planning Database (UK government), where it last changed on 13 January 2025.
Where is Borders General Hospital - Solar Photovoltaic Array?
4.6 km south-east of Galashiels, Borders, United Kingdom (postcode TD6 9BS).

Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).