Solar · United Kingdom
Borders General Hospital - Solar Photovoltaic Array
Operator NHS Borders Health Board
Awaiting Construction0.7 MWData checked 16 November 2026Source record dated 13 January 2025
Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.
Borders General Hospital - Solar Photovoltaic Array is a 0.7 MW solar farm 4.6 km south-east of Galashiels, Borders, United Kingdom. Its planning application (24/00821/FUL) went to Scottish Borders on 16 July 2024 and was granted on 6 December 2024. Its status in the Renewable Energy Planning Database (UK government) is awaiting construction. There are 5 other energy sites within 10 km, 4 of them solar farms (hybrid battery and solar sites included). The register holds no incident at this site. It holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom, and 480 worldwide.
Get an email when Borders General Hospital - Solar Photovoltaic Array changes
Free. An email when its status changes: a planning decision, building starting, going live or closing. And each Monday, solar PV incidents in the United Kingdom. No account needed; unsubscribe in one click.
Confirm your email and every solar incident on the register arrives at once as a spreadsheet (CSV), free.
Get a free sample brief Three complete verified records and the incidents-per-GW table, by email within a minute.
We will also email you about the register's paid records and plans, at most once a week and three times in all. You can stop these at any time. By signing up you agree to the privacy policy.
Preparing, reviewing or responding to a planning application for a site like this? The planning evidence pack for Borders General Hospital - Solar Photovoltaic Array sets out every comparable incident for this project, with sources. £295, by email in minutes; the order form arrives filled in from this record.
Get the evidence pack for this site, £295 See a sample pack (PDF)
Preview of the planning evidence pack for this site
The pack for this site lists 104 comparable solar incidents in the United Kingdom, nearest first. The nearest is EIR-2016, Solar panel fire evacuates Hawick High School, 19 km from this site.
| Reference | Year | Incident | From the site | Severity |
|---|---|---|---|---|
| EIR-2016 | 2022 | Solar panel fire evacuates Hawick High School | 19 km | Significant |
| EIR-1238 | 2019 | Leak from solar heating system at Carnegie Leisure Centre Dunfermline | 69 km | Minor |
| EIR-1499 | 2025 | Solar panels linked to fires at council buildings in Northumberland | 92 km | Significant |
| •••••••• | •••• | •••••••••••••••••••••••••••••• | •••• | •••••• |
| •••••••• | •••• | •••••••••••••••••••••••••••••• | •••• | •••••• |
| •••••••• | •••• | •••••••••••••••••••••••••••••• | •••• | •••••• |
| •••••••• | •••• | •••••••••••••••••••••••••••••• | •••• | •••••• |
| •••••••• | •••• | •••••••••••••••••••••••••••••• | •••• | •••••• |
The first 3 rows as the pack shows them. The other 101 are in the pack, each with its distance, sources and the fire service guidance it bears on.
The map
Summary for this site
This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.
Paragraphs for the planning statement
This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.
In the full packThe site
- Technology
- Solar
- Capacity
- 0.7 MW
- Capacity figure from
- Renewable Energy Planning Database (UK government)
- Status
- Awaiting Construction (Planning Permission Granted)
- Operator or applicant
- NHS Borders Health Board
- Location
- S/O Borders General Hospital, Melrose, Borders, TD6 9BS, United Kingdom
- Planning authority
- Scottish Borders
- Planning application
- 24/00821/FUL
View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.
The planning application page for 24/00821/FUL, with what the planning evidence pack adds for this site.
Every application in Scottish Borders · Alerts for applications and incidents near here
Timeline
- 16 July 2024 Planning application submitted
- 6 December 2024 Planning permission granted
- 6 December 2027 Planning permission runs out
Incidents on the register at this site
None found. The register holds no published incident that names Borders General Hospital - Solar Photovoltaic Array. If you know of one, report it (confidential reports are anonymised).
Questions
- Has Borders General Hospital - Solar Photovoltaic Array had a fire or other incident?
- None is on the register as of 21 November 2026. The register holds no published incident that names Borders General Hospital - Solar Photovoltaic Array; it holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom.
- What is the status of Borders General Hospital - Solar Photovoltaic Array?
- Awaiting Construction, in the Renewable Energy Planning Database (UK government), where it last changed on 13 January 2025.
- Where is Borders General Hospital - Solar Photovoltaic Array?
- 4.6 km south-east of Galashiels, Borders, United Kingdom (postcode TD6 9BS).
Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).