← Back to Lancashire
Planning pack for this site, £295Other options

Solar · United Kingdom

Border Force Warehouse, South Quay - Solar Panels

Operator EON B2B Solutions

Awaiting Construction0.5 MWData checked 16 November 2026Source record dated 1 April 2025

Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.

Border Force Warehouse, South Quay - Solar Panels is a 0.5 MW solar farm on the edge of Heysham, Lancashire, United Kingdom. Its planning application (25/00169/PAS) went to Lancaster on 12 February 2025 and was granted on 24 March 2025. Its status in the Renewable Energy Planning Database (UK government) is awaiting construction. There are 30 other energy sites within 10 km, 9 of them solar farms (hybrid battery and solar sites included). The register holds no incident at this site. It holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom, and 480 worldwide.

Preparing, reviewing or responding to a planning application for a site like this? The planning evidence pack for Border Force Warehouse, South Quay - Solar Panels sets out every comparable incident for this project, with sources. £295, by email in minutes; the order form arrives filled in from this record.

Get the evidence pack for this site, £295 See a sample pack (PDF)

The pack for this site lists 104 comparable solar incidents in the United Kingdom, nearest first. The nearest is EIR-1244, Fire reported to have started in solar panels at Westleigh primary school, 66 km from this site.

ReferenceYearIncidentFrom the siteSeverity
EIR-12442018Fire reported to have started in solar panels at Westleigh primary school66 kmSignificant
EIR-27712024Fire involves rooftop solar panels and lithium batteries on Bradford house roof83 kmMinor
EIR-15022025Storm Eowyn damages solar panels at Newton Aycliffe Leisure Centre109 kmMinor
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••

The first 3 rows as the pack shows them. The other 101 are in the pack, each with its distance, sources and the fire service guidance it bears on.

The map

Summary for this site

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

Paragraphs for the planning statement

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

In the full pack
Technology
Solar
Capacity
0.5 MW
Capacity figure from
Renewable Energy Planning Database (UK government)
Status
Awaiting Construction (Planning Permission Granted)
Operator or applicant
EON B2B Solutions
Location
Border Force Warehouse South Quay Heysham Harbour Heysham, Lancashire, LA3 2XF, United Kingdom
Planning authority
Lancaster
Planning application
25/00169/PAS

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

The planning application page for 25/00169/PAS, with what the planning evidence pack adds for this site.

Every application in Lancaster · Alerts for applications and incidents near here

  • 12 February 2025 Planning application submitted
  • 24 March 2025 Planning permission granted

None found. The register holds no published incident that names Border Force Warehouse, South Quay - Solar Panels. If you know of one, report it (confidential reports are anonymised).

Has Border Force Warehouse, South Quay - Solar Panels had a fire or other incident?
None is on the register as of 21 November 2026. The register holds no published incident that names Border Force Warehouse, South Quay - Solar Panels; it holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom.
What is the status of Border Force Warehouse, South Quay - Solar Panels?
Awaiting Construction, in the Renewable Energy Planning Database (UK government), where it last changed on 1 April 2025.
Where is Border Force Warehouse, South Quay - Solar Panels?
On the edge of Heysham, Lancashire, United Kingdom (postcode LA3 2XF).

Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).