Planning pack for this site, £295Other options

Solar · United Kingdom

Blueprint Gaming, Northern Road - Solar Panels

Operator Blueprint Gaming Limited

Awaiting Construction0.2 MWData checked 16 November 2026Source record dated 4 November 2025

Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.

Blueprint Gaming, Northern Road - Solar Panels is a 0.2 MW solar farm on the edge of Newark on Trent, Nottinghamshire, United Kingdom. Its planning application (25/01330/PA) went to Newark and Sherwood on 5 August 2025 and was granted on 30 September 2025. Its status in the Renewable Energy Planning Database (UK government) is awaiting construction. There are 34 other energy sites within 10 km, 15 of them solar farms (hybrid battery and solar sites included). The register holds no incident at this site. It holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom, and 480 worldwide.

Preparing, reviewing or responding to a planning application for a site like this? The planning evidence pack for Blueprint Gaming, Northern Road - Solar Panels sets out every comparable incident for this project, with sources. £295, by email in minutes; the order form arrives filled in from this record.

Get the evidence pack for this site, £295 See a sample pack (PDF)

The pack for this site lists 104 comparable solar incidents in the United Kingdom, nearest first. The nearest is EIR-1265, Solar panels catch fire and destroy three buildings in Harby, 24 km from this site.

ReferenceYearIncidentFrom the siteSeverity
EIR-12652024Solar panels catch fire and destroy three buildings in Harby24 kmSignificant
EIR-07642024Transformer smoking at solar farm in Burton Pedwardine33 kmMinor
EIR-15522023Fire starts in solar panels on commercial roof in Doncaster46 kmSignificant
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••

The first 3 rows as the pack shows them. The other 101 are in the pack, each with its distance, sources and the fire service guidance it bears on.

The map

Summary for this site

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

Paragraphs for the planning statement

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

In the full pack
Technology
Solar
Capacity
0.2 MW
Capacity figure from
Renewable Energy Planning Database (UK government)
Status
Awaiting Construction (Planning Permission Granted)
Operator or applicant
Blueprint Gaming Limited
Location
Blueprint Blueprint House Northern Road Newark On Trent, Nottinghamshire, NG24 2EU, United Kingdom
Planning authority
Newark and Sherwood
Planning application
25/01330/PA

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

The planning application page for 25/01330/PA, with what the planning evidence pack adds for this site.

Every application in Newark and Sherwood · Alerts for applications and incidents near here

  • 5 August 2025 Planning application submitted
  • 30 September 2025 Planning permission granted

None found. The register holds no published incident that names Blueprint Gaming, Northern Road - Solar Panels. If you know of one, report it (confidential reports are anonymised).

Has Blueprint Gaming, Northern Road - Solar Panels had a fire or other incident?
None is on the register as of 21 November 2026. The register holds no published incident that names Blueprint Gaming, Northern Road - Solar Panels; it holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom.
What is the status of Blueprint Gaming, Northern Road - Solar Panels?
Awaiting Construction, in the Renewable Energy Planning Database (UK government), where it last changed on 4 November 2025.
Where is Blueprint Gaming, Northern Road - Solar Panels?
On the edge of Newark on Trent, Nottinghamshire, United Kingdom (postcode NG24 2EU).

Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).