Planning pack for this site, £295Other options

Solar · United Kingdom

Blanche Lane, South Mimms - Solar Panels

Operator Private Developer

Under Construction0.6 MWData checked 16 November 2026Source record dated 20 June 2022

Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.

Blanche Lane, South Mimms - Solar Panels is a 0.6 MW solar farm 4.3 km west of Potters Bar, Hertfordshire, United Kingdom. Its planning application (22/0985/PD56O) went to Hertsmere on 10 June 2022 and was granted on 23 August 2023. Construction started on 5 December 2022. Its status in the Renewable Energy Planning Database (UK government) is under construction. There are 59 other energy sites within 10 km, 41 of them solar farms (hybrid battery and solar sites included). The register holds no incident at this site. It holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom, and 480 worldwide.

PRIVATE DEVELOPER NETWORK LIMITED (09386318), dissolved, since 2015. No outstanding charges on the register. Members see the charges register: each charge, when it was created and the lender it is in favour of.

Source: Companies House, matched by the operator's name. If this is the wrong company, tell the editor.

Preparing, reviewing or responding to a planning application for a site like this? The planning evidence pack for Blanche Lane, South Mimms - Solar Panels sets out every comparable incident for this project, with sources. £295, by email in minutes; the order form arrives filled in from this record.

Get the evidence pack for this site, £295 See a sample pack (PDF)

The pack for this site lists 104 comparable solar incidents in the United Kingdom, nearest first. The nearest is EIR-1514, Garage fire destroys solar panels in Southgate, with a battery storage fault suspected, 10.0 km from this site.

ReferenceYearIncidentFrom the siteSeverity
EIR-15142024Garage fire destroys solar panels in Southgate, with a battery storage fault suspected10.0 kmMinor
EIR-11702025Rooftop solar panels catch fire at IKEA store in Wembley15 kmSignificant
EIR-07742023Solar panel fire destroys roof of Ealing Council house in Greenford19 kmMajor
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••

The first 3 rows as the pack shows them. The other 101 are in the pack, each with its distance, sources and the fire service guidance it bears on.

The map

Summary for this site

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

Paragraphs for the planning statement

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

In the full pack
Technology
Solar
Capacity
0.6 MW
Capacity figure from
Renewable Energy Planning Database (UK government)
Status
Under Construction
Operator or applicant
Private Developer
Location
N I B S C Blanche Lane South Mimms, Hertfordshire, EN6 3QG, United Kingdom
Planning authority
Hertsmere
Planning application
22/0985/PD56O

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

The planning application page for 22/0985/PD56O, with what the planning evidence pack adds for this site.

Every application in Hertsmere · Alerts for applications and incidents near here

  • 10 June 2022 Planning application submitted
  • 5 December 2022 Construction started
  • 23 August 2023 Planning permission granted

None found. The register holds no published incident that names Blanche Lane, South Mimms - Solar Panels. If you know of one, report it (confidential reports are anonymised).

Has Blanche Lane, South Mimms - Solar Panels had a fire or other incident?
None is on the register as of 21 November 2026. The register holds no published incident that names Blanche Lane, South Mimms - Solar Panels; it holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom.
What is the status of Blanche Lane, South Mimms - Solar Panels?
Under Construction, in the Renewable Energy Planning Database (UK government), where it last changed on 20 June 2022.
Where is Blanche Lane, South Mimms - Solar Panels?
4.3 km west of Potters Bar, Hertfordshire, United Kingdom (postcode EN6 3QG).

Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).