← Back to Pennsylvania

Solar · United States

Blairs Valley Solar Project

Operator CleanChoice Energy · Owner CCE Genco, LLC (51%), Churchill Stateside Renewable Energy Fund XXXIV, LLC? (49%)

Operational20 MWData checked 12 November 2026

Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.

Blairs Valley Solar Project is a 20 MW solar farm 22 km north-west of Fountainhead-Orchard Hills, Franklin County, Pennsylvania, United States. It first operated in 2025. Its status in the U.S. Energy Information Administration, Form EIA-860M is operational. There are 2 other energy sites within 10 km. The register holds no incident at this site. It holds 168 incidents at solar farms (hybrid battery and solar sites included) in the United States, and 480 worldwide.

The operator's 1 other site and 34 energy sites within 40 km for Blairs Valley Solar Project

Members see the sites and incidents around this one, and every record behind them.

Technology
Solar
Capacity
20 MW
Capacity figure from
U.S. Energy Information Administration, Form EIA-860M
Status
Operational
Operator
CleanChoice Energy
Owner
CCE Genco, LLC (51%), Churchill Stateside Renewable Energy Fund XXXIV, LLC? (49%)
Location
Franklin County, Pennsylvania, United States
First operating
2025
Balancing authority
PJM

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

Alerts for applications and incidents near here

None found. The register holds no published incident that names Blairs Valley Solar Project. If you know of one, report it (confidential reports are anonymised).

Own, insure or lend to this site or others like it? A portfolio safety record checks every site in a list against the register, free; the paid records add the site, operator, cause, downtime and loss behind each incident.

Has Blairs Valley Solar Project had a fire or other incident?
None is on the register as of 21 November 2026. The register holds no published incident that names Blairs Valley Solar Project; it holds 168 incidents at solar farms (hybrid battery and solar sites included) in the United States.
What is the status of Blairs Valley Solar Project?
Operational, in the U.S. Energy Information Administration, Form EIA-860M.
Where is Blairs Valley Solar Project?
22 km north-west of Fountainhead-Orchard Hills, Franklin County, Pennsylvania, United States.

Source: U.S. Energy Information Administration, Form EIA-860M (Preliminary Monthly Electric Generator Inventory). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).