Bishopthorpe

Operational16.4 MWChecked 6 October 2026Last changed in the dataset 20 April 2017

Technology
Onshore wind
Capacity
16.4 MW
Status
Operational
Operator or applicant
Greencoat UK (formerly BayWa r.e.)
Location
Bishopthorpe Farm, Bishopthorpe, Tetney, Grimsby, Humberside, Lincolnshire, United Kingdom
Planning authority
East Lindsey
Planning application
N/178/01969/12
Appeal reference
APP/D2510/A/14/2213150
First operating
2017
Turbines
8, 115 m to tip

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

  • 2 October 2012 Planning application submitted
  • 5 February 2014 Planning permission refused
  • 13 February 2014 Appeal lodged
  • 20 March 2015 Planning permission granted
  • 20 March 2015 Granted by the Secretary of State
  • 25 January 2016 Construction started
  • 30 January 2017 Operational

None found. The register holds no published incident that names Bishopthorpe. If you know of one, report it (confidential reports are anonymised).

The register holds 54 incidents at onshore wind farms in the United Kingdom, 22 of them fires, and 297 worldwide. Counts of incidents in published reporting, not rates.

What fails at onshore wind farms

Own, insure or lend to this site or others like it? A portfolio safety record checks every site in a list against the register, free; the paid records add the site, operator, cause, downtime and loss behind each incident.

Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts.