Solar · United States
Bishop Ranch - BR 3-FF
Operator Camino Ramon BR 3-FF Solar Project 2020, LLC
Under construction0.8 MWData checked 12 November 2026
Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.
Bishop Ranch - BR 3-FF is a 0.8 MW solar farm on the edge of San Ramon, Contra Costa County, California, United States. Its status in the U.S. Energy Information Administration, Form EIA-860M is under construction. There are 29 other energy sites within 10 km, 12 of them solar farms (hybrid battery and solar sites included). The register holds no incident at this site. It holds 168 incidents at solar farms (hybrid battery and solar sites included) in the United States, and 480 worldwide.
Get an email when Bishop Ranch - BR 3-FF changes
Free. An email when its status changes: a planning decision, building starting, going live or closing. And each Monday, solar PV incidents in the United States. No account needed; unsubscribe in one click.
Confirm your email and every solar incident on the register arrives at once as a spreadsheet (CSV), free.
Get a free sample brief Three complete verified records and the incidents-per-GW table, by email within a minute.
We will also email you about the register's paid records and plans, at most once a week and three times in all. You can stop these at any time. By signing up you agree to the privacy policy.
Preparing, reviewing or responding to a planning application for a site like this? The planning evidence pack for Bishop Ranch - BR 3-FF sets out every comparable incident for this project, with sources. £295, by email in minutes; the order form arrives filled in from this record.
Get the evidence pack for this site, £295 See a sample pack (PDF)
Preview of the planning evidence pack for this site
The pack for this site lists 168 comparable solar incidents in the United States, nearest first. The nearest is EIR-1252, Napa Valley College solar field reported taken offline after leakage concern, 86 km from this site.
| Reference | Year | Incident | From the site | Severity |
|---|---|---|---|---|
| EIR-1252 | 2021 | Napa Valley College solar field reported taken offline after leakage concern | 86 km | Significant |
| EIR-2408 | 2024 | Rooftop solar fire forces evacuation of five-storey Sacramento building | 99 km | Significant |
| EIR-1403 | 2023 | Vegetation fire burns nearly 60 acres on a solar farm near Jamestown | 138 km | Significant |
| •••••••• | •••• | •••••••••••••••••••••••••••••• | •••• | •••••• |
| •••••••• | •••• | •••••••••••••••••••••••••••••• | •••• | •••••• |
| •••••••• | •••• | •••••••••••••••••••••••••••••• | •••• | •••••• |
| •••••••• | •••• | •••••••••••••••••••••••••••••• | •••• | •••••• |
| •••••••• | •••• | •••••••••••••••••••••••••••••• | •••• | •••••• |
The first 3 rows as the pack shows them. The other 165 are in the pack, each with its distance, sources and the fire service guidance it bears on.
The map
Summary for this site
This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.
Paragraphs for the planning statement
This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.
In the full packThe site
- Technology
- Solar
- Capacity
- 0.8 MW
- Capacity figure from
- U.S. Energy Information Administration, Form EIA-860M
- Status
- Under construction
- Operator
- Camino Ramon BR 3-FF Solar Project 2020, LLC
- Owner
- Camino Ramon BR 3-FF Solar Project 2020, LLC
- Location
- Contra Costa County, California, United States
- Expected
- 2027
- Balancing authority
- CISO
View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.
Incidents on the register at this site
None found. The register holds no published incident that names Bishop Ranch - BR 3-FF. If you know of one, report it (confidential reports are anonymised).
Questions
- Has Bishop Ranch - BR 3-FF had a fire or other incident?
- None is on the register as of 21 November 2026. The register holds no published incident that names Bishop Ranch - BR 3-FF; it holds 168 incidents at solar farms (hybrid battery and solar sites included) in the United States.
- What is the status of Bishop Ranch - BR 3-FF?
- Under construction, in the U.S. Energy Information Administration, Form EIA-860M.
- Where is Bishop Ranch - BR 3-FF?
- On the edge of San Ramon, Contra Costa County, California, United States.
Source: U.S. Energy Information Administration, Form EIA-860M (Preliminary Monthly Electric Generator Inventory). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).