Solar · United Kingdom
Big Yellow Self Storage, Drakes Way - Solar Panels
Operator Big Yellow Group Plc
Awaiting Construction0.2 MWData checked 16 November 2026Source record dated 25 October 2023
Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.
Big Yellow Self Storage, Drakes Way - Solar Panels is a 0.2 MW solar farm on the edge of Swindon, Wiltshire, United Kingdom. Its planning application (S/PSOLP/23/1073) went to Swindon on 24 August 2023 and was granted on 18 October 2023. Its status in the Renewable Energy Planning Database (UK government) is awaiting construction. There are 63 other energy sites within 10 km, 44 of them solar farms (hybrid battery and solar sites included). The register holds no incident at this site. It holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom, and 480 worldwide.
Get an email when Big Yellow Self Storage, Drakes Way - Solar Panels changes
Free. An email when its status changes: a planning decision, building starting, going live or closing. And each Monday, solar PV incidents in the United Kingdom. No account needed; unsubscribe in one click.
Confirm your email and every solar incident on the register arrives at once as a spreadsheet (CSV), free.
Get a free sample brief Three complete verified records and the incidents-per-GW table, by email within a minute.
We will also email you about the register's paid records and plans, at most once a week and three times in all. You can stop these at any time. By signing up you agree to the privacy policy.
The company behind this site
BIG YELLOW GROUP PLC (03625199), active, since 1998. 11 outstanding charges on the register. Members see the charges register: each charge, when it was created and the lender it is in favour of.
Source: Companies House, matched by the operator's name. If this is the wrong company, tell the editor.
Preparing, reviewing or responding to a planning application for a site like this? The planning evidence pack for Big Yellow Self Storage, Drakes Way - Solar Panels sets out every comparable incident for this project, with sources. £295, by email in minutes; the order form arrives filled in from this record.
Get the evidence pack for this site, £295 See a sample pack (PDF)
Preview of the planning evidence pack for this site
The pack for this site lists 5 comparable battery incidents in the United Kingdom, grid-scale only, nearest first. The nearest is EIR-0058, Fire in two battery containers at Cirencester Hybrid Solar Farm, Gloucestershire, 20 km from this site.
| Reference | Year | Incident | From the site | Severity |
|---|---|---|---|---|
| EIR-0058 | 2025 | Fire in two battery containers at Cirencester Hybrid Solar Farm, Gloucestershire | 20 km | Significant |
| EIR-0109 | 2025 | Fire in single battery unit at Thurrock BESS under construction | 151 km | Significant |
| EIR-0249 | 2026 | Smoke and fire incident at Battery Box, Pinhoe Road, Exeter | 151 km | Significant |
| •••••••• | •••• | •••••••••••••••••••••••••••••• | •••• | •••••• |
| •••••••• | •••• | •••••••••••••••••••••••••••••• | •••• | •••••• |
The first 3 rows as the pack shows them. The other 2 are in the pack, each with its distance, sources and the fire service guidance it bears on.
The map
Summary for this site
This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.
Paragraphs for the planning statement
This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.
In the full packThe site
- Technology
- Solar
- Capacity
- 0.2 MW
- Capacity figure from
- Renewable Energy Planning Database (UK government)
- Status
- Awaiting Construction (Planning Permission Granted)
- Operator or applicant
- Big Yellow Group Plc
- Location
- Big Yellow Self Storage, Drakes Way, Walcot, Swindon, Wiltshire, SN3 3JN, United Kingdom
- Planning authority
- Swindon
- Planning application
- S/PSOLP/23/1073
View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.
The planning application page for S/PSOLP/23/1073, with what the planning evidence pack adds for this site.
Every application in Swindon · Alerts for applications and incidents near here
Timeline
- 24 August 2023 Planning application submitted
- 18 October 2023 Planning permission granted
Incidents on the register at this site
None found. The register holds no published incident that names Big Yellow Self Storage, Drakes Way - Solar Panels. If you know of one, report it (confidential reports are anonymised).
Questions
- Has Big Yellow Self Storage, Drakes Way - Solar Panels had a fire or other incident?
- None is on the register as of 21 November 2026. The register holds no published incident that names Big Yellow Self Storage, Drakes Way - Solar Panels; it holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom.
- What is the status of Big Yellow Self Storage, Drakes Way - Solar Panels?
- Awaiting Construction, in the Renewable Energy Planning Database (UK government), where it last changed on 25 October 2023.
- Where is Big Yellow Self Storage, Drakes Way - Solar Panels?
- On the edge of Swindon, Wiltshire, United Kingdom (postcode SN3 3JN).
Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).