Berwick Bank Offshore Wind Farm

Operator Scottish Southern Energy Renewables

Awaiting Construction4,100 MWData checked 16 November 2026Source record dated 19 January 2026

Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.

Berwick Bank Offshore Wind Farm is a 4,100 MW offshore wind farm, United Kingdom. Its planning application (NA) went to Marine Scotland on 9 December 2022 and was granted on 31 July 2025. Its status in the Renewable Energy Planning Database (UK government) is awaiting construction. No other energy site in the register's datasets is within 10 km. The register holds no incident at this site. It holds 63 incidents at wind farms in the United Kingdom, and 362 worldwide.

Preparing, reviewing or responding to a planning application for a site like this? The planning evidence pack for Berwick Bank Offshore Wind Farm sets out every comparable incident for this project, with sources. £295, by email in minutes; the order form arrives filled in from this record.

Get the evidence pack for this site, £295 See a sample pack (PDF)

The pack for this site lists 14 comparable offshore wind incidents in the United Kingdom, nearest first. The nearest is EIR-2700, Repeat Vestas turbine failures hit pioneering floating wind project in Scotland, 166 km from this site.

ReferenceYearIncidentFrom the siteSeverity
EIR-27002026Repeat Vestas turbine failures hit pioneering floating wind project in Scotland166 kmSignificant
EIR-00292024Second blade failure of 2024 at Dogger Bank A offshore wind farm169 kmSignificant
EIR-07582024Service vessel collision damages turbine at Orsted's Hornsea Project One offshore wind farm169 kmSignificant
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••

The first 3 rows as the pack shows them. The other 11 are in the pack, each with its distance, sources and the fire service guidance it bears on.

The map

Summary for this site

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

Paragraphs for the planning statement

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

In the full pack
Technology
Offshore wind
Capacity
4,100 MW
Capacity figure from
Renewable Energy Planning Database (UK government)
Status
Awaiting Construction (Planning Permission Granted)
Operator or applicant
Scottish Southern Energy Renewables
Location
Berwick Bank Offshore Wind Farm, E/O St Abbs Head, Coastline, Eyemouth, Offshore, TD14, United Kingdom
Planning authority
Marine Scotland
Planning application
NA
Turbines
307, 200 m to tip

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

The planning application page for NA, with what the planning evidence pack adds for this site.

Every application in Marine Scotland · Alerts for applications and incidents near here

  • 9 December 2022 Planning application submitted
  • 31 July 2025 Planning permission granted

None found. The register holds no published incident that names Berwick Bank Offshore Wind Farm. If you know of one, report it (confidential reports are anonymised).

Has Berwick Bank Offshore Wind Farm had a fire or other incident?
None is on the register as of 21 November 2026. The register holds no published incident that names Berwick Bank Offshore Wind Farm; it holds 63 incidents at wind farms in the United Kingdom.
What is the status of Berwick Bank Offshore Wind Farm?
Awaiting Construction, in the Renewable Energy Planning Database (UK government), where it last changed on 19 January 2026.
Where is Berwick Bank Offshore Wind Farm?
Berwick Bank Offshore Wind Farm, E/O St Abbs Head, Coastline, Eyemouth, United Kingdom (postcode TD14).

Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts.