Solar · United Kingdom

Berllandeg Farm, Rhoswiel - Solar Panels

Operator Private Developer

Revised1.3 MWData checked 16 November 2026Source record dated 3 September 2024

Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.

Berllandeg Farm, Rhoswiel - Solar Panels is a 1.3 MW solar farm 6.3 km north of Oswestry, Shropshire, United Kingdom. Its planning application (24/01380/FUL) went to Shropshire on 24 May 2024 and was refused on 4 July 2024. Its status in the Renewable Energy Planning Database (UK government) is revised. There are 27 other energy sites within 10 km, 21 of them solar farms (hybrid battery and solar sites included). The register holds no incident at this site. It holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom, and 480 worldwide.

PRIVATE DEVELOPER NETWORK LIMITED (09386318), dissolved, since 2015. No outstanding charges on the register. Members see the charges register: each charge, when it was created and the lender it is in favour of.

Source: Companies House, matched by the operator's name. If this is the wrong company, tell the editor.

Preparing, reviewing or responding to a planning application for a site like this? The planning evidence pack for Berllandeg Farm, Rhoswiel - Solar Panels sets out every comparable incident for this project, with sources. £295, by email in minutes; the order form arrives filled in from this record.

Get the evidence pack for this site, £295 See a sample pack (PDF)

The pack for this site lists 104 comparable solar incidents in the United Kingdom, nearest first. The nearest is EIR-1553, Roof fire involving 14 solar panels attended in Shropshire, 37 km from this site.

ReferenceYearIncidentFrom the siteSeverity
EIR-15532017Roof fire involving 14 solar panels attended in Shropshire37 kmMinor
EIR-15472025Small fire within a solar panel at a house in Shropshire40 kmMinor
EIR-15502021Small fire involving solar panels at a property in Clun40 kmMinor
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••

The first 3 rows as the pack shows them. The other 101 are in the pack, each with its distance, sources and the fire service guidance it bears on.

The map

Summary for this site

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

Paragraphs for the planning statement

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

In the full pack
Technology
Solar
Capacity
1.3 MW
Capacity figure from
Renewable Energy Planning Database (UK government)
Status
Revised
Operator or applicant
Private Developer
Location
North Of Rhoswiel Weston Rhyn, Shropshire, SY10 7TA, United Kingdom
Planning authority
Shropshire
Planning application
24/01380/FUL

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

The planning application page for 24/01380/FUL, with what the planning evidence pack adds for this site.

Every application in Shropshire · Alerts for applications and incidents near here

  • 24 May 2024 Planning application submitted
  • 4 July 2024 Planning permission refused

None found. The register holds no published incident that names Berllandeg Farm, Rhoswiel - Solar Panels. If you know of one, report it (confidential reports are anonymised).

Has Berllandeg Farm, Rhoswiel - Solar Panels had a fire or other incident?
None is on the register as of 21 November 2026. The register holds no published incident that names Berllandeg Farm, Rhoswiel - Solar Panels; it holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom.
What is the status of Berllandeg Farm, Rhoswiel - Solar Panels?
Revised, in the Renewable Energy Planning Database (UK government), where it last changed on 3 September 2024.
Where is Berllandeg Farm, Rhoswiel - Solar Panels?
6.3 km north of Oswestry, Shropshire, United Kingdom (postcode SY10 7TA).