Planning pack for this site, £295Other options

Solar · United Kingdom

Becketts Farm, Alcester Road - Solar Panels

Operator AE Beckett & Sons Limited

Application Submitted0.3 MWData checked 16 November 2026Source record dated 8 October 2026

Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.

Becketts Farm, Alcester Road - Solar Panels is a 0.3 MW solar farm 8.3 km east of Barnt Green, West Midlands, United Kingdom. Its planning application (26-00971-PRIOR) went to Bromsgrove on 17 August 2026. Its status in the Renewable Energy Planning Database (UK government) is application submitted. There are 49 other energy sites within 10 km, 39 of them solar farms (hybrid battery and solar sites included). The register holds no incident at this site. It holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom, and 480 worldwide.

Preparing, reviewing or responding to a planning application for a site like this? The planning evidence pack for Becketts Farm, Alcester Road - Solar Panels sets out every comparable incident for this project, with sources. £295, by email in minutes; the order form arrives filled in from this record.

Get the evidence pack for this site, £295 See a sample pack (PDF)

The pack for this site lists 104 comparable solar incidents in the United Kingdom, nearest first. The nearest is EIR-1272, Fire in solar panel distribution board at Birmingham college, 12 km from this site.

ReferenceYearIncidentFrom the siteSeverity
EIR-12722022Fire in solar panel distribution board at Birmingham college12 kmMinor
EIR-25232020Suspected solar panel fault sparks roof fire at Ombersley home26 kmSignificant
EIR-01722026Fire at Wheat Leasows solar farm in Telford involves an electricity pylon55 kmMinor
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••

The first 3 rows as the pack shows them. The other 101 are in the pack, each with its distance, sources and the fire service guidance it bears on.

The map

Summary for this site

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

Paragraphs for the planning statement

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

In the full pack
Technology
Solar
Capacity
0.3 MW
Capacity figure from
Renewable Energy Planning Database (UK government)
Status
Application Submitted (Planning Application Submitted)
Operator or applicant
AE Beckett & Sons Limited
Location
Becketts Farm, Alcester Road, Wythall, West Midlands, B47 6AJ, United Kingdom
Planning authority
Bromsgrove
Planning application
26-00971-PRIOR

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

The planning application page for 26-00971-PRIOR, with what the planning evidence pack adds for this site.

Every application in Bromsgrove · Alerts for applications and incidents near here

  • 17 August 2026 Planning application submitted

None found. The register holds no published incident that names Becketts Farm, Alcester Road - Solar Panels. If you know of one, report it (confidential reports are anonymised).

Has Becketts Farm, Alcester Road - Solar Panels had a fire or other incident?
None is on the register as of 21 November 2026. The register holds no published incident that names Becketts Farm, Alcester Road - Solar Panels; it holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom.
What is the status of Becketts Farm, Alcester Road - Solar Panels?
Application Submitted, in the Renewable Energy Planning Database (UK government), where it last changed on 8 October 2026.
Where is Becketts Farm, Alcester Road - Solar Panels?
8.3 km east of Barnt Green, West Midlands, United Kingdom (postcode B47 6AJ).

Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).